Done another practice EICR form this week, and i'm a bit stumped on the reference method box on the schedule of circuits.
Is it acceptable to write LIM in the box, as i have listed in the limitations box that i am not removing floor boards/inspecting cables in concealed locations. So how could i possibly know the reference method?