dlt27
-
- Joined
- Jul 4, 2011
- Messages
- 196
- Reaction score
- 30
More experienced help needed please. Scenario is Mains intake and MET(PME) outside the building in cupboard with KMF's (80A fuse) feeding flats via 16mmT+E. 2 flats gas meters are in cupboard at mains with 10mm bonds. 1 flat has gas meter in flat with no 10mm bond. Also no 10mm bonds to water. All flats have local 6mm bonding to gas and water from flat DB.
To run 10mm bonds to water and 1 gas meter will be a nightmare as being listed etc also would have to be run outdoors because would need access through others flats . Also loads of electrical work has been done without this being picked up.
All I wanted to know is what code to give this on EICR (I will probably be doing work). NAPIT tech guy said code 2 or 3, but wouldn't commit to one. I have heard others say if no signs of overheating on 6mm then no code. I asked NAPIT guy if i could give code 3 and satisfatory report he then said code 2.
Please help. Thank you.
To run 10mm bonds to water and 1 gas meter will be a nightmare as being listed etc also would have to be run outdoors because would need access through others flats . Also loads of electrical work has been done without this being picked up.
All I wanted to know is what code to give this on EICR (I will probably be doing work). NAPIT tech guy said code 2 or 3, but wouldn't commit to one. I have heard others say if no signs of overheating on 6mm then no code. I asked NAPIT guy if i could give code 3 and satisfatory report he then said code 2.
Please help. Thank you.