How does this work?
Not exact costs just a number.
Hear people on ÂŁ50 a point.
So
Oblivious say db ÂŁ350 fixed cost 10 way.
10 x sockets on ring ÂŁ50 each
Lighting.
1 x way switch and a pendant ÂŁ50 Or classed as ÂŁ100..

2 way switch and a pendant ÂŁ50 Or ÂŁ150.
Cooker must be classed as more .

Personally I work on day rate if domestic but only for existing commercial/ industrial customers so happy to pay vat etc.

Just curious how it works.
 
I have found that the only way pricing by point can work is if you work it out for you. No point in working to someone elses price per point.
Take a few completed jobs priced as you normally would that worked out well and profitable, and divide the price by the number of points. Fiddle it about a bit until you get to a price per point you think works for you. Obviously type of job will have a huge bearing on the point price.
 
How does this work?
Not exact costs just a number.
Hear people on ÂŁ50 a point.
So
Oblivious say db ÂŁ350 fixed cost 10 way.
10 x sockets on ring ÂŁ50 each
Lighting.
1 x way switch and a pendant ÂŁ50 Or classed as ÂŁ100..

2 way switch and a pendant ÂŁ50 Or ÂŁ150.
Cooker must be classed as more .

Personally I work on day rate if domestic but only for existing commercial/ industrial customers so happy to pay vat etc.

Just curious how it works.
light = 1 point. switch = 1 point. total 2 points. a 2 way set-up with 1 light, 2 switches = 3 points.

cost per point downlighters would obviously reflect the cost of the fittings, as would other accessories, i.e. higher cost if fancy accessories like nickel finish etc.
 
Price per point is a very crude way of doing work if you are doing lots and lots of the same jobs...

When I started out on council house re-wires the main sparks just quoted ÂŁ40 per point back then and iirc ÂŁ60 for the cooker and smokes. It was a very basic way of doing quotes. I think a split board with new main bonding was about ÂŁ300 back then.

All cheap white accessories and no making good (and very limited testing afterwards)
 
It seems ÂŁ50 p/point has been banded around for quite a few years now. I think ÂŁ60 p/point is nearer the mark. Saying that, I prefer to have a think how long it is going to take me then add materials. However, when you first start out perhaps p/point pricing may be a better idea as it is difficult to estimate how long it will take. I would also count the lighting switch as a point and the light itself as a point, therefore ÂŁ120 if 1 way, ÂŁ180 if 2 way (as 2 switches).
 
My price per point (which I rarely use these days) is based on LAP screwfix accessories. If the customer wants anything else like MK then 10% is added to my P.P.P

Chrome or Nickle plated gear is priced and added to the quote
 
Price per point has to be 0n a sliding scale price with break points set for multiples and has to include the travel otherwise you end up losing out.
Reminds me a bit of the old measured term contracts that were based on the schedule of rates book published by The Stationary Office, it was incredibly difficult to price and impossible to know that the pricing was right if you won the contract until the end of the 3 year contract
 
My price per point (which I rarely use these days) is based on LAP screwfix accessories. If the customer wants anything else like MK then 10% is added to my P.P.P

Chrome or Nickle plated gear is priced and added to the quote
10%? At your rates? PPP would be 1.5-2 hours labour per point. I know MK is expensive, but it's not that expensive all the same.

Anyone in these parts fitting LAP and screwfix gear, it stinks of a DIY job
 

Reply to Pricing per points in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
701
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

Iv done both. And my personal preference is material and labour. It works better.
2
Replies
15
Views
693
Echo above, as someone who's probably similarly inexperienced I have set myself up a per point spreadsheet and whack it all in there. This has...
Replies
9
Views
670

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top