Bromd123
-
Hi Guys
I've been with my uncle to price a job but i think he's overpriced it, I wonder if you guys would give me an idea of what you would charge.
ITs a new kitchen extension the way that he wants to do it is take a 10mm SWA from the meter through tail splitters along the outside wall and into a new 5 way CU in the Kitchen. there are to be 7 double socket points and 3 spurs for cooker hood fridge and dishwasher as well as a cooker switch. There are also 16 florescent downlighters to be installed and 2 3gang switches to control half of the flo downlights at each switch and also the hood lights
The extension is new and hasnt been plastered yet
I would be interested in what you would charge LABOUR ONLY as i think he's REALLY overpriced it
Thanks guys
I've been with my uncle to price a job but i think he's overpriced it, I wonder if you guys would give me an idea of what you would charge.
ITs a new kitchen extension the way that he wants to do it is take a 10mm SWA from the meter through tail splitters along the outside wall and into a new 5 way CU in the Kitchen. there are to be 7 double socket points and 3 spurs for cooker hood fridge and dishwasher as well as a cooker switch. There are also 16 florescent downlighters to be installed and 2 3gang switches to control half of the flo downlights at each switch and also the hood lights
The extension is new and hasnt been plastered yet
I would be interested in what you would charge LABOUR ONLY as i think he's REALLY overpriced it
Thanks guys