Hello all...
Quick q...
Ok, the tails will be split feed a small house and an annex.. The earthing system is TT. SWA will be ran to the Annex about 20m away. 25mm SWA 2 core will be used.
Am I correct in saying that a 30ma dtime delayed rcd should be installed befor the cu?
A earth rod will be fitted direct to the annex cu?
Quick q...
Ok, the tails will be split feed a small house and an annex.. The earthing system is TT. SWA will be ran to the Annex about 20m away. 25mm SWA 2 core will be used.
Am I correct in saying that a 30ma dtime delayed rcd should be installed befor the cu?
A earth rod will be fitted direct to the annex cu?