You will need to know from whoever is installing the Powerwall where they are locating the both the Powerwall unit and Backup Gateway(s), essentially just a changeover relay / contactor and whether they can manage with 1 Gateway or they need 2.
That'll determine how to run the cables to each C.U., you can't plan anything without knowing that.

Split load CU's should work
 
Last edited:
You will need to know from whoever is installing the Powerwall where they are locating the both the Powerwall unit and Backup Gateway(s), essentially just a changeover relay / contactor and whether they can manage with 1 Gateway or they need 2.
That'll determine how to run the cables to each C.U., you can't plan anything without knowing that.

Split load CU's should work
The gateway needed is 1 as per the diagram . They want non backup
Board and backup board separately on each floor which is why it sums up to 4 Cus. Also split load won’t work as I can’t have 2 mains connected into it . One of the solar and other of the grid
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
London
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Trainee Electrician

Thread Information

Title
Rewiring a 5-Bedroom House with Powerwall 3 Integration
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
18

Advert

Thread statistics

Created
Writer,
Last reply from
Writer,
Replies
18
Views
403

Advert

Back
Top