My grandson is confused by conflicting information given by contractors quoting to rewire his house, which is a small 3 bed semi.
The incoming mains and meter are located at the front of the property (external meter cupboard). The consumer unit is located in the kitchen at the rear of the property.
One contractor has quoted for an 80 amp switched fuse at the meter location and running , within the property, a T&E 16 mm cable to the consumer unit. They also want to run a separate earth conductor to the T&E cable to the consumer unit. The distance from meter to consumer is some 10 metres.
The consumer unit, as well as controlling circuits within the house, will also supply a feed to a domestic garage and garden shed situated some 40 metre from the consumer unit. The electrician proposes to run a 3 core SWA cable size 2.5 mm. to a smaller consumer unit in the garage. This unit to supply Fridge Freezer. Tumble Drier. Lights and approx three 13 amp sockets.
The confusion comes because the quotes obtained are all different. I accept that are likely to be differences with regards to labour charges but expected there to be conformity with regards to cable sizes etc and similar approaches to the installation.
Can any one clear up this confusion.
The incoming mains and meter are located at the front of the property (external meter cupboard). The consumer unit is located in the kitchen at the rear of the property.
One contractor has quoted for an 80 amp switched fuse at the meter location and running , within the property, a T&E 16 mm cable to the consumer unit. They also want to run a separate earth conductor to the T&E cable to the consumer unit. The distance from meter to consumer is some 10 metres.
The consumer unit, as well as controlling circuits within the house, will also supply a feed to a domestic garage and garden shed situated some 40 metre from the consumer unit. The electrician proposes to run a 3 core SWA cable size 2.5 mm. to a smaller consumer unit in the garage. This unit to supply Fridge Freezer. Tumble Drier. Lights and approx three 13 amp sockets.
The confusion comes because the quotes obtained are all different. I accept that are likely to be differences with regards to labour charges but expected there to be conformity with regards to cable sizes etc and similar approaches to the installation.
Can any one clear up this confusion.