Hi everyone,
I have been asked to look at someones Garage for them as they want to be able to have more "stuff" in there.
currently it is powered by a 2.5 t&e run from the house CU straight to a 2g pattress. But they want a separate CU in the garage.
my initial idea was to henley block and put a fused switch in and run 10mm SWA from that. however the house CU is in the middle of the house so would need a good 3m run in the house and another 3-4m to get it underground to the garage.
the customer asked if the was anyway to not use SWA through the house? so i mentioned about adaptable boxes.
Now my question is could i run 10mm 3core (to maintain the CPC size and not T&E) to an adaptable box mounted externally then gland some 10mm SWA to that terminated on the inside, and earthing the steel? and then repeat on the garage side?
Providing all my tests are fine is there any issue with this?
I have been asked to look at someones Garage for them as they want to be able to have more "stuff" in there.
currently it is powered by a 2.5 t&e run from the house CU straight to a 2g pattress. But they want a separate CU in the garage.
my initial idea was to henley block and put a fused switch in and run 10mm SWA from that. however the house CU is in the middle of the house so would need a good 3m run in the house and another 3-4m to get it underground to the garage.
the customer asked if the was anyway to not use SWA through the house? so i mentioned about adaptable boxes.
Now my question is could i run 10mm 3core (to maintain the CPC size and not T&E) to an adaptable box mounted externally then gland some 10mm SWA to that terminated on the inside, and earthing the steel? and then repeat on the garage side?
Providing all my tests are fine is there any issue with this?