hi all
so i have job this is my first consumer units replace job. i have a question about the best, safe way to remove old and fit new. i thint about pull out main fuse but they is sealing, so i think i cant touch ?? if i can i think this is the best waym but if i cant do this how i can pull safety main live cable ?? because is a danger but i have to know, because i thintk i get some other job in future and i looking some good trik to do this :) Problem is, this main cable is very stiff and difficult to remove.
thanks for any halp
 
Let's look at it this way lads. this week and another 2 weeks i/we have a 2330 level 2 qualified student with us on a large house rewire, he asked me about pulling the main fuse. My reply was:-

1. Don't do it at your level of experience or quals (no where near yet IMHO).

2. When you are ready to do it make sure you know what your doing from the training (not yet received) by us.

3. Full on safety must be applied, full concentration and adequate equipment must by used.

4. The ability to understand what you are dealing with.

5. Switch off all the load before touching it.

6. Fit an isolation switch before you leave.

7. No electrician has been prosecuted in a court of law in the UK for pulling the bullet (long as it as not caused death or injury).
 
IMHO I agree with most of the posts TO A POINT and the words COMPETANCE and SAFELY the legality issue could go round n round
the Campetance and safety issue is the paramount one and altho a lot of properties have nice henley series 7 cutouts there are loads more old cruddy bakalite cast iron ect ect some with no covering over lives once the fuse is removed ( btw this could constitute a code 1 if done on a PIR unless there is requirement to "use a tool to remove" and exposing live parts ???)
The competance is in the control of person carrying out the work IF you have doubts DONT DO IT ie if you have to come here and ask about it then IMHO Your not competant

)
 
The competance is in the control of person carrying out the work IF you have doubts DONT DO IT ie if you have to come here and ask about it then IMHO Your not competant

Sorry mogga, but I cant agree with you on this one. Its seems such a sweeping statement. Lots of competant people ask questions on this site about a job they want to do.
 
I agree with Spoon - I have to change my first consumer unit soon and I have passed all my level 3 exams and 17th edition exams etc however I although I am sure I will know how to pull out a fuse from a fuse carrier safely I have never done so. Hence that's why people like us come on forums like this for a little clarity. A little shortage of confidence DOESN'T mean we are completely incompetant!

Sorry guys it's just that some people with less experience are looking for reassurance from people on here that have tons of experience and who's help we really appreciate.
 
Last edited by a moderator:
But you’re not sure are you? Sorry but faced with an old porcelain cutout what are you going to do? Grasp the nettle and pull (it’ll sting)!

I wouldn't be sure your right - It's not something we would have been taught and it only comes with experience when your faced with that scenario and the majority of us would seek advise on how to deal with something like an old porcelain cutout safely i'm sure.
 
i agree with Bud1975. OK i I have passed level 3 exams and 17th edition exam, so i am qualifited electrician ?? I know is lot of professional electrician on this forum, but i think (i know) everyone of pro electrician ever changing fuse board first time. So this is my question how do this safe, any trick, or technic... About main fuse i think this is ilegal but alooooooooooooooooooot electrician change fuse board anyway so how they do this ?? Anywya - thanks for a lot respond for my topic. and sorry for my english :)
 
Sorry, ....That's not what i've been told happens at all. For a start, most of the meters that are installed these days are conducted by meter installer companies, not actually by the DNO at all!!! The only time you see DNO operatives at an existing cut-out/meter installation, is if there is a problem with the cut-out or the supply cable side....

Secondly i've been reliably informed, and has been confirmed here on the forum several times by employees of these companies, that these meter company installers get , ...if they are lucky one or two days training!! That's a bit of a difference to what you are saying here!!! And i have no interest either way, whether sparks in the UK pull cut-out fuses or not!!!
 
Having attended an electricity board cable jointers course along with some of their operatives doing LV joints and heads they get more than one weeks training. I was doing training on up to 33KV joints, but while I was in the training shop I asked if I could do a 3ph+n splice live. I was in line with all the other lads, believe me when you know that conductor in your hand is LIVE, life takes on a whole new meaning. I got several belts until I learnt about safe touch zones.

BAS look, listen and learn. There’s more to life than a book of regulations, as I’ve said before, practicality being one of the main ones.
 
Having attended an electricity board cable jointers course along with some of their operatives doing LV joints and heads they get more than one weeks training. I was doing training on up to 33KV joints, but while I was in the training shop I asked if I could do a 3ph+n splice live. I was in line with all the other lads, believe me when you know that conductor in your hand is LIVE, life takes on a whole new meaning. I got several belts until I learnt about safe touch zones.

BAS look, listen and learn. There’s more to life than a book of regulations, as I’ve said before, practicality being one of the main ones.

Now your talking!! ....That was in the the days of the regional electrical boards. I wonder if that training is still as comprehensive as you found, under the new privatised DNO set-up?? Or maybe they consider/deemed, that full training is not financially viable!! ...lol!!
 
I Know that Scottish power still have a large training facility in cumbernauld they use it for their own Opperatives L.A. streetlighting opps also hold courses there on types of head and overhead line stuff I beleive that Subbys have courses there before they get tickets to work on submains ect
 
Now your talking!! ....That was in the the days of the regional electrical boards. I wonder if that training is still as comprehensive as you found, under the new privatised DNO set-up?? Or maybe they consider/deemed, that full training is not financially viable!! ...lol!!

It was with the EMEB. A fantastic course, a laugh a minute, but we did learn a lot.
· Lesson 1: Don’t drop the gas torch in the paraffin tray. Entire collage evacuated while we put the fire out.
· Lesson 2: Don’t trust your mate. Molten lead hurts when it lands on your wrist.
· Lesson 3: There’s only one way to put a joint together. Guy looking confused as he tries to work out how to get the core spreaders in after he’s dressed the lead sleeve down. (Chuck them in the corner, no one will know when it’s filled with compound).
· Lesson 4: My trick, don’t get the lead wire and solder mixer up. You can’t solder with lead wire. It melts but won’t stick to anything.
Take notes when they show you the black museum, I didn’t know there was so many ways to fiddle a lecy meter, some crude, some downright ingenious!

View attachment 7375
 
Last edited by a moderator:

Reply to Safe change consumer unit - main fuse seal question in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Hi everyone, If you are looking for reliable EV chargers, check out our top-rated selection at E2GO! ⚡ Please note that all EV Chargers and...
Replies
0
Views
155
  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
969
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K

Similar threads

This was posted this week, on topic ....... https://niceic.com/newsletter/omission-of-overload-protection/?dm_i=7G1W,7GCE,K4L2A,WHET,1
Replies
8
Views
955
I generally thought double stack boards were more for situations where a portrait design is better suited to the cupboard - you still generally...
Replies
4
Views
495

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top