Going to be running a sub panel underground 100+- ft to new steel building will be running a 2-2-2-2 Aluminum SER Cable. (Planning n 100amp svc even thought I doubt I will EVER need it.)
If the #2 SER Cable is
2 (+)
1 (-)
1(g)
Why am I running a ground all the way back to the panel?
Seems to me since I will need a rod at the building to ground from the sub panel, Couldn't I run a 2-2-2 Aluminum SER Cable 2+ and 1-
And meet the grounding needs for the sub panel with the local rod?