Hi
I have lurked here a while but have never posted before.
I have been to a site this week with a view to put some motors on some gates, however the current installation needs some attention.
The site is a builders yard sited probably 20 meters from a large house the yard is supplied by 10MM SWA from a Pme supply at the house dno sticker on the cut out.
There are a couple of shipping containers converted to storage units converted to storage units. They both have lights and two 13amp sockets.
The containers and the fence posts do not test as extraneous and this was a wet damp day. However I am uneasy about them being connected to the Pme given the new regs possibly meaning a lost pen conductor is not as unheard of as we are led to believe.
My instinct is to disconnect the earth and tt the site with a few rods but do you think there is a valve in keeping the pme earth also.
On my arrival there was no rcd at any end but have swapped main switch in container as had one on the van.
Sorry for long post.
Thanks
Tom
I have lurked here a while but have never posted before.
I have been to a site this week with a view to put some motors on some gates, however the current installation needs some attention.
The site is a builders yard sited probably 20 meters from a large house the yard is supplied by 10MM SWA from a Pme supply at the house dno sticker on the cut out.
There are a couple of shipping containers converted to storage units converted to storage units. They both have lights and two 13amp sockets.
The containers and the fence posts do not test as extraneous and this was a wet damp day. However I am uneasy about them being connected to the Pme given the new regs possibly meaning a lost pen conductor is not as unheard of as we are led to believe.
My instinct is to disconnect the earth and tt the site with a few rods but do you think there is a valve in keeping the pme earth also.
On my arrival there was no rcd at any end but have swapped main switch in container as had one on the van.
Sorry for long post.
Thanks
Tom