I wire mobile decontamination units and we have a large unit that requires 4 electric showers.
Normally we use a standard metal 4way CU with rcd and mcb for each shower and its own 32A plugin inlet.
I would like to put all showers in the same board and have four 32A inlets coming from the board and each circuit separated inside.
It's possible all 4 inlets will be supplied by a onsite generator.
I can't seem to find any information on whether this is bad practice but also can not think of a reason why we can't do it.
The electrician who has just left the company said it was bad practice
Normally we use a standard metal 4way CU with rcd and mcb for each shower and its own 32A plugin inlet.
I would like to put all showers in the same board and have four 32A inlets coming from the board and each circuit separated inside.
It's possible all 4 inlets will be supplied by a onsite generator.
I can't seem to find any information on whether this is bad practice but also can not think of a reason why we can't do it.
The electrician who has just left the company said it was bad practice