just a suggestion if the company is new to this side of the works, look at maybe getting some help in on a temporary basis to go through with you & look at each certificate for the year, make an appointment with every job that looks like has problems with the certificate & get the results required, just a suggestion.

a way to do this would be that you are carrying out an internal audit of everything carried over last 12 months & would they mind if you made an appointment as their worked had been short listed for audit purposes.
 
The certificate was passed off the the O&M with the job considered completed. My boss is trying to say the limitations are justified as some access could not be had, but there is nothing in writing to back this up and I think the assessor will take a dim view of that.

We will see. All I can do is be prepared for the assessment as well as I can be so that he isn't immediately ----ed off
 
The certificate was passed off the the O&M with the job considered completed. My boss is trying to say the limitations are justified as some access could not be had, but there is nothing in writing to back this up and I think the assessor will take a dim view of that.

We will see. All I can do is be prepared for the assessment as well as I can be so that he isn't immediately ****ed off
the problem is the limitations are not on the test certificate, we had a limitation on a test sheet but not recorded & was only minor but assessor wanted to know why not recorded & no details, that was for one limitation reading the certificate in the picture you might of needed a new sheet to get all that information on.
 
Even he/she would know that practically you can not isolate the who hospital to disconnect the main earth conductor to do a Ze. You never answered my question of are you undertaking the PDH job as well.
 
Even he/she would know that practically you can not isolate the who hospital to disconnect the main earth conductor to do a Ze. You never answered my question of are you undertaking the PDH job as well.
would you not record the maximum for the stated type of supply, put this down in notes & then record your own results for the DB'S installed, if you cannot isolate supply that is ?
you could get ZDB for the installed boards
 

Reply to Signed certs that are filled in badly in the Commercial Electrical Advice area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
956
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top