It would be rare for a supplier to put in place a PME facility on a construction site so the OP may have misinterpreted the situation.
Doesn’t have to be a purposly installed supply for a construction site.
It would be rare for a supplier to put in place a PME facility on a construction site so the OP may have misinterpreted the situation.
??Doesn’t have to be a purposly installed supply for a construction site.
I read it differently but you almost certainly right given there's regs preventing the PME being utilised.Agree but I read it as the PME stopped at that point and TT takes over(?)
Lol, I'm officially confused in that case, he did state the incoming supply as being TN C S... in which case a high liklihood of PME![]()
It would be rare for a supplier to put in place a PME facility on a construction site so the OP may have misinterpreted the situation.
I think there's a word missing there... it