I would like to pick up on the paperwork side of things here, as I must say the risk assessment was one of the many contentious points raised during my assessment. Now, I only do domestic work, yet I was asked to provide a sample RA. My previous scheme (NAPIT)had not asked for one, and to honest I never use them, I can't see the point in a domestic situation. We ended up having quite a, shall we say, vigorous argument about this. He insisted that a RA was submitted and signed by the customer before starting work, I told him I thought that was unnecessary and frankly a bit stupid in most domestic circumstances. I asked him exactly what he thought should be in it, and how it would work in reality, to which he didn't have much of an answer. I then asked him if he was sure he wasn't getting mixed up with having an RA for your own employees if you have 5 or more, which I don't. He went away with a comment about requiring to see them next year. So, I then emailed several people at Stroma, on two occasions, to ask what exactly they required and had they got a sample RA, and why it was needed anyway. I never got a reply, which is typical. I will use this as my argument next time, if there is one. Hopefully the assessor won't be a numbskull next time.........

What a muppet....
 
I would like to pick up on the paperwork side of things here, as I must say the risk assessment was one of the many contentious points raised during my assessment. Now, I only do domestic work, yet I was asked to provide a sample RA. My previous scheme (NAPIT)had not asked for one, and to honest I never use them, I can't see the point in a domestic situation.................................... I will use this as my argument next time, if there is one. Hopefully the assessor won't be a numbskull next time.........
Elecsa have a draft copy document for H&S and RA as a download, which you just amend and add your details My assessor asks for this document every time, but never reads it. The idea being you complete an RA for every job, I don't. Sure Stroma must have something similar. You might also need to have a look at 'Construction (Design & Management) Regulations 2015, and see if that affects you.
 

Reply to Stroma in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
707
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

It’s sad that you had to say no more money to them for them to pull their fingers out.
Replies
9
Views
990
I usually put something like this To assess compliance with BS7671 for continued safe operation (5 year periodical inspection)
Replies
8
Views
512

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top