Hi All,
Been asker to run a submain 100m metres from origin to a shed. This shed will have a 7.5kw shower, 6kw oven, 2 x 3kw water heaters as well as general power and lighting(not much about 12 lights & 12 twin sockets)
Not sure if running 3 phase supply would make more sense? Financially and size of cable for glanding etc. Any thoughts?
Thanks
Been asker to run a submain 100m metres from origin to a shed. This shed will have a 7.5kw shower, 6kw oven, 2 x 3kw water heaters as well as general power and lighting(not much about 12 lights & 12 twin sockets)
Not sure if running 3 phase supply would make more sense? Financially and size of cable for glanding etc. Any thoughts?