Supply cable and switch gear | Page 4 | on ElectriciansForums

Discuss Supply cable and switch gear in the UK Electrical Forum area at ElectriciansForums.net

Telgee

-
Joined
Aug 15, 2018
Messages
5
Reaction score
1
Location
Kent
hi there all ...a friend is having works done to there lord of the Manor House and are converting a barn to a 2 bed house also having a car port with 3 electric fast charge car chargers
Car port is 70 metres away
Barn is 100 metres away
Supply is being moved in the house to new location out of the cellar and they are already being charged ÂŁ9000 for that which is 3 phase so they wanna save some cash by running there own supply cables for carport and barn conversion what cable should they run ?? Also what other things need to be purchased and put in place until they hire a sparky to connect ??
Any advice gratefully accepted
 
Don't take things so personally. This is a site for debate and that's what's going on. You are not coming across as rude and people disagreeing with you are not making personal attacks
Thanks for everyone's comments, I'll take on board and carry on learning! Hopefully i can learn faster than i forget...:)
 
it’s dropping in a couple of cables while trenches are open... ...as not being a qualified electrician I didn’t realise there was so many variables in cables that could be run ?? And as most things in life it all equates back to mathematics in some shape or form ...
so for the car port the load for 3 charges is 22kw each or 66kw total So reading what I have does that equate to roughly each charger 10 amp for 240v supply and less for 400v supply ?? Swa?? What size ?? How many cables that can be buried in the dirt carry that over a 70m distance with the voltage drop included ?? Will the earth be suffice if 3 core swa and one of the cores be used or does it need to be run seperately or use earth rod ??

22kW car charger? Are you sure you don’t mean 2.2kW?

Is the submain to be three phase or single?
Can any diversity be applied?
What other loads are there planned to be connected or foreseeable in the future?
What is the earthing system and Ze?
 
Last edited:
Late to the party as ever...
To the OP
The Cart Goes After the Horse.
Engage a suitably qualified electrical contractor, hey, engage several. Give accurate, identical specifications to each and ask them to price accordingly.
Then Robert might end up as your Mothers brother.
 

Reply to Supply cable and switch gear in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
388
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
970
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
You need a CT clamp at main tails, it depends on the rules where you are - you used to be allowed wireliss ones (such as MyEnergi Harvi), these...
Replies
14
Views
3K
Just stick the 63amp fused connector before the Henley block , or Lucy block as you call it, and your all good, as for your 2nd point, , the...
Replies
1
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top