im designing an installation and pricing for a large property, i plan to feed sub mains using swa. Maybe a silly question, can i gland the swa in a stud wall and bring the cores through the plaster to the consumer units? customer wants to see no cables and id much rather use swa than twin for sub mains. Was planning to run another cpc along side the swa on the very rare chance the swa gland isnt as tight as was when first installed
thanks!
im designing an installation and pricing for a large property, i plan to feed sub mains using swa. Maybe a silly question, can i gland the swa in a stud wall and bring the cores through the plaster to the consumer units? customer wants to see no cables and id much rather use swa than twin for sub mains. Was planning to run another cpc along side the swa on the very rare chance the swa gland isnt as tight as was when first installed