If an fuses for existing spare switched fuse unit within a switch panel is now obsolete (GEC Alsthom) then is it going to be a case of upgrading the whole panel if I want to add a new circuit?

That could turn a ÂŁ500 job into about a ÂŁ10k job.

I suspect I could get the parts off eBay but they probably aren't back by manufacturers warranty any more and don't want to install something that isn't legit.
 
They just pull out. I have had a look on google but only manage to find second hand ones which have been 'reconditioned' at best. I will not install anything but brand new and which is backed by manufacturers warranty in order to cover my ---.

Don't suppose you've even discussed this with your client then, because we all know what they are going to decide don't we!! Hmmm, (client Thinks....)10K or a couple of hundred, 10K or a couple of hundred, 10K, or a couple of hundred, ...... Let's try the reconditioned unit first shall we!!! ...lol!!
 
Don't suppose you've even discussed this with your client then, because we all know what they are going to decide don't we!! Hmmm, (client Thinks....)10K or a couple of hundred, 10K or a couple of hundred, 10K, or a couple of hundred, ...... Let's try the reconditioned unit first shall we!!! ...lol!!

I've just come off the phone to the the client. They said they would be happy if the panel was upgraded as it would also ensure that future spare ways are available. The want to expand the building in a year or so anyway and remodel the existing internal space. Now to get some quotes from panel manufacturers. Any recommendations? I've always been happy with Schneider.
 
Well the only thing to do is inform the client of the two ways of doing it ie 500 or 5k and let him supply the switch fuse and write on the CERs equipment supplied by others (clients own equipment)
Do it all the time. The NIC inspectors or fine with that and so will the client or company.
 
Well the only thing to do is inform the client of the two ways of doing it ie 500 or 5k and let him supply the switch fuse and write on the CERs equipment supplied by others (clients own equipment)
Do it all the time. The NIC inspectors or fine with that and so will the client or company.
Whatbhave they got to do with the relationship between the customer and client?
 
Well the only thing to do is inform the client of the two ways of doing it ie 500 or 5k and let him supply the switch fuse and write on the CERs equipment supplied by others (clients own equipment)
Do it all the time. The NIC inspectors or fine with that and so will the client or company.

Thanks for the advice. That's worth noting. I guess its how you explain it to the client, but my only concern with that would be if the client starts to think, 'hang on, this guy isn't happy installing this equipment and it isn't backed by warranty, should I really be buying it for him to install'.
 
I've just come off the phone to the the client. They said they would be happy if the panel was upgraded as it would also ensure that future spare ways are available. The want to expand the building in a year or so anyway and remodel the existing internal space. Now to get some quotes from panel manufacturers. Any recommendations? I've always been happy with Schneider.

That sounds like a cockeyed way of doing things, how are you going to size and spec this switchboard if you don't know what upgrades to the electrical system are going to be made. You could well end up in a similar position you are in now, just a couple of years down the line, ...eg spare cubicles of the wrong size etc!!
 
That sounds like a cockeyed way of doing things, how are you going to size and spec this switchboard if you don't know what upgrades to the electrical system are going to be made. You could well end up in a similar position you are in now, just a couple of years down the line, ...eg spare cubicles of the wrong size etc!!

Thats where I would specify an MCCB Panel board with a minimum of 25% spare capacity and use MCCB's.
 
Atm84 - obsolete gear may warrant a reconditioned unit, many professional companies do do this and to a good standard, this attitude of new or nothing is very narrow minded, liasing with the customer is essential but scaremongering and giving him biased opinion based info is not professional.
Purchase a reconditioned unit fit it and jobs done, it seems your dipping in areas here where you lack experience so tread carefully, like some systems with removable drawer switchfuse gear there are limitations to how switchgear are arranged and manufacturers original spec' may for instance express 2 larger ampage drawers should be spaced apart by at least 1 chamber of lower rated.

Reading through it seems you are creating work here that isn't yet required and your unsure of what the sites future requirements may be, if your going to change it all make sure you fit a future proof set up in (within reason).

Is the site close to its max demand on existing supply yet etc .... this may warrant a larger scale and rated set-up fitting to pre-empt a supply upgrade, its pointless changing virtually like for like to find your in a similar problem 5yrs down the line because of poor forsight or lack of investigation.
 
Last edited by a moderator:
I said 25% SPARE WAY capacity not 25% spare LOAD capacity. The incoming service head is rated at 800 amps Three Phase. I suspect there is approx 500 amps load but will be carrying out load monitoring for a min two week period to ascertain actual max demand but I think there should be plenty of spare LOAD capacity.
 
Atm84 - obsolete gear may warrant a reconditioned unit, many professional companies do do this and to a good standard, this attitude of new or nothing is very narrow minded, liasing with the customer is essential but scaremongering and giving him biased opinion based info is not professional.
Purchase a reconditioned unit fit it and jobs done, it seems your dipping in areas here where you lack experience so tread carefully, like some systems with removable drawer switchfuse gear there are limitations to how switchgear are arranged and manufacturers original spec' may for instance express 2 larger ampage drawers should be spaced apart by at least 1 chamber of lower rated.

Reading through it seems you are creating work here that isn't yet required and your unsure of what the sites future requirements may be, if your going to change it all make sure you fit a future proof set up in (within reason).

Is the site close to its max demand on existing supply yet etc .... this may warrant a larger scale and rated set-up fitting to pre-empt a supply upgrade, its pointless changing virtually like for like to find your in a similar problem 5yrs down the line because of poor forsight or lack of investigation.

My question is can reconditioned equipment be backed by Manufacturer's warranty? I suspect not. if it can then I will hold my hands up, but if not then I will not install it.
 
My question is can reconditioned equipment be backed by Manufacturer's warranty? I suspect not. if it can then I will hold my hands up, but if not then I will not install it.

The company who do the reconditioning will give a limited warranty usually 6-months is common which is still enough to show any issues with the gear, discussing the options first with client and saying he is still covered by a limited warranty on second-hand reconditioned gear may swing things to a simple cheap job in the context of the alternative.

I have sourced 2nd hand gear myself and used it while expressing to customer I cannot give any warranty of the gear but it saves thousands in the alternative options... this type of gear is usually well made and robust and were built like tanks mechanically hence companies recondition them, Id be more concerned about modern gear been recycled if obsolete as quality for durability has dropped over the decades.
 
Ok that is useful info. I could advise the client of this, but after our conversation, I think he may still want to go with a whole upgrade. Can you recommend any companies who can supply reconditioned switch fuses for GEC Alsthom gear?
 
Give these a ring 36months guarantee ... Our reconditioned switchgear comes with a 36 month guarantee | Slaters Electricals

I think your mind set is wrong regarding reconditioned gear of this nature, they don't wipe the dust off and regrease they engineer and replace any worn parts, lame springs etc, in essence as good as new hence this company give a better guarantee then the original manufacturer.

If you locate the part you need then I would in your shoes contact your client and express you have been put in contact with a reputable company and you have had a re-think and in the short term advise fitting the reconditioned unit but in the long term maybe look into making a full site analysis and draft up a proposal for a upgrade which can be better organised with site power downs than rushing a job through now..

This is why I said you lack experience in this area and not a knock at your competence but hopefully in future you could provide better solutions on the strength of what you may have picked up on this thread for your client. If unsure never talk off the cuff; any client will be happy if you say I have to make some phone calls etc to see if the gear can be sourced, then use the time to refine your knowledge of the equipment too.
 
Last edited by a moderator:

Reply to Switch Panel upgrade in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
373
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
938
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
How did it go?
Replies
12
Views
2K
  • Question
much more information required. Is the supply to the first building a DNO supply or a sub main cable from another building ? if it is a sub main...
Replies
5
Views
957

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top