uksparks
-
Hi,
This morning's job, in and out in 4 and a half hours. Vast improvement. Feel free to rip it apart and tell me I'm a fool and I've made a bodge of it and don't know what I'm doing.
I did actually heat shrink the end of that line conductor and disconnect the relevant earth and neutral and shrink them the same, it was for a shower circuit thats not connect in the loft, they also got labelled accordingly.
You may say why the cable ties, I saw one of you do it the other week on here, Trev i think or GMES maybe? Looked nice.
Ok I know MCB 8 is on when it doesn't need to be, I did switch it off.
This morning's job, in and out in 4 and a half hours. Vast improvement. Feel free to rip it apart and tell me I'm a fool and I've made a bodge of it and don't know what I'm doing.
I did actually heat shrink the end of that line conductor and disconnect the relevant earth and neutral and shrink them the same, it was for a shower circuit thats not connect in the loft, they also got labelled accordingly.
You may say why the cable ties, I saw one of you do it the other week on here, Trev i think or GMES maybe? Looked nice.
Ok I know MCB 8 is on when it doesn't need to be, I did switch it off.