Back in 2011 I was involved in the installation of electrics for a high spec conservatory. UFH was put in by a 3rd party and I refused to connect and sign off. At the time I discussed it with the supplier/installer and he told me 100s if not 1000s had been installed with no problems. In the end he had to get somebody else to travel down and connect up.
I've now returned to do an EICR and I'm still not happy with it.
Let me show you a photograph and would welcome comments.
Photo shows the cables feeding the mats coming out of 2 pattress (connectors only) and disappearing under the tiles.
There are 7 mats in total, split between 2 SFS (also in pictures). All controlled via a stat and some contactors.
I've now returned to do an EICR and I'm still not happy with it.
Let me show you a photograph and would welcome comments.
Photo shows the cables feeding the mats coming out of 2 pattress (connectors only) and disappearing under the tiles.
There are 7 mats in total, split between 2 SFS (also in pictures). All controlled via a stat and some contactors.