What happens when you go to a job to wire a boiler and there is no way to get a 10mm to the gas meter or water stop tap? If I had to run a new supply instead of using existing, how do I stand?
on an old TT system that is in need of serious work, rcd not working (!!!) and old black wylex 4 way board...
on an old TT system that is in need of serious work, rcd not working (!!!) and old black wylex 4 way board...
Last edited: