T
thekingiam
as mentioned in a previous post i wanted to use my sisters property as a way of joining elecsa,after a previous quote she had for a rewire of ÂŁ3600 like for like but incorporating pvc channeling all around the house! i tried to quote for this myself but as the costs of labc elecsa and insurance books etc added up as well as a propper job ( i think?) i quoted ÂŁ1800.i sent her a list of works in the style of original quote and she just rang me saying her husband wants a list of how i came up with the quote ie materials etc..
will try to add my list of works to thread but a document file any ideas how i can do this because i don't know how?
i have spent alot of time and effort into this and i know material wise they are going to knitpick every item in a materials list that i have roughly put together on a peice of scrap papper.
i dont mind doing a materials list or explaining to them that they are paying nearly a grand on getting it sighned off because i have added nearly 30 extra sockets where needed mostly chased and where possible a total rewire.
one of the problems i have is the amount of cable generaly used on a 3 bed house 2.5 ,1.5 any ideas? apart from walk!!
will try to add my list of works to thread but a document file any ideas how i can do this because i don't know how?
i have spent alot of time and effort into this and i know material wise they are going to knitpick every item in a materials list that i have roughly put together on a peice of scrap papper.
i dont mind doing a materials list or explaining to them that they are paying nearly a grand on getting it sighned off because i have added nearly 30 extra sockets where needed mostly chased and where possible a total rewire.
one of the problems i have is the amount of cable generaly used on a 3 bed house 2.5 ,1.5 any ideas? apart from walk!!