AlexanderSmi123
DIY
Good afternoon everyone, I am Alex and I'm new here.
I am posting this to ask for advice with how I should approach this situation.
We called in an electrician, and as confirmed in writing by messages, the original request was to change the socket covers and change lightbulbs through the flat (1 bedroom flat). After completing the job, the electrician sends us an invoice which lists the labour and material costs, and a rough breakdown of the works done. The final bill is OVER ÂŁ2,000 (almost all of it labour) and lists 30 hours of work. On top of the requested works, it also details a lot of other works, which were not requested nor authorised by us, including various tests and other changes. To make the situation more difficult, we were away during this time as the flat was under renovation and could not confirm what works exactly have been at the time.
Given this extremely unreasonable bill, what is the best way to approach the situation?
Any help would be appreciated, and thank you for your advice.
I am posting this to ask for advice with how I should approach this situation.
We called in an electrician, and as confirmed in writing by messages, the original request was to change the socket covers and change lightbulbs through the flat (1 bedroom flat). After completing the job, the electrician sends us an invoice which lists the labour and material costs, and a rough breakdown of the works done. The final bill is OVER ÂŁ2,000 (almost all of it labour) and lists 30 hours of work. On top of the requested works, it also details a lot of other works, which were not requested nor authorised by us, including various tests and other changes. To make the situation more difficult, we were away during this time as the flat was under renovation and could not confirm what works exactly have been at the time.
Given this extremely unreasonable bill, what is the best way to approach the situation?
Any help would be appreciated, and thank you for your advice.