richy8ball

new fuse board with 5 circuits plus bonding, wiring a radial and lighting in the garage all surface, changing 4 light fittings, turning 10 single sockets into doubles, adding 3 extra sockets on the ring. wondering whats a fair price for this work?
 
What Biff said.

It's nearly impossible to price a job accurately without seeing it first.
In the same way you wouldn't be able to give a price for a job like that over the phone, nobody here can help you with a comparative price.
 
new fuse board with 5 circuits
Fuse or MCB / RCBO, 5 existing or including the new circuits, easy access, D.N.O isolator?

plus bonding
what size and distance and method of fixing, surface under floor in ceiling ,?

wiring a radial and lighting in the garage all surface
how far from C.U how big is garage, how long are the cable runs, timber, brick concrete sectional ?

changing 4 light fittings,
LED, pendant, decorative, external spots / floods ?

turning 10 single sockets into doubles,
surface boxes, flush, brick block plaster, or board or eggbox or straw walls, cheap sockets, screwless, designer?

adding 3 extra sockets on the ring,
how far from existing sockets, what sockets, cheap, screwless?


wondering whats a fair price for this work?

Are you VAT reg?

Somewhere from ÂŁ350 to ÂŁ1800,, possibly??? + Vat, possibly
 
It all depends on how much time is needed to add the 3 sockets to the ring, wire the garage, and install the earth wires to gas and water. The board cost and replacement 10 single to double sockets are fairly easy to price, changing 4 lights also fairly straight forward, you need to see the job to estimate whats involved with the labour for the wiring aspect.

It certainely sounds like 2-3 days work, and thats the thing here with this Job, whether it is 2 or 3 days????????????????
 
Work out material costs add 15% then charge for your time, don't forget it all needs to be signed off to comply so if your not niceic or any other governing body allow an extra couple of hundred pound for building control :)
 

Reply to upgrade quote in the Business Related area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
361
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
918
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Echo above, as someone who's probably similarly inexperienced I have set myself up a per point spreadsheet and whack it all in there. This has...
Replies
9
Views
579
  • Question
What is the distance from the point outside the house to the shed?
Replies
8
Views
779

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top