I am puzzled as to why the discussion is about various ways of changing tails from the cut out to the meter
(Unless my quick read through the thread gave me the wrong impression)
The meter tails from the fuse to the meter are the property and responsibility of the supplier and not in our remit to alter
If the consumers tails are upgraded or changed and access is required to connect them,so be it,cut the seal and away to go
If you dont want to cut the seal,connect the new tails to the old via henley blocks and lodge a test form to the supplier,who charge about £ 16 I believe,to come and make the connection
I need to upgrade the tails between the fuse and the meter as well as to the cu as they are only in 16mm.
(Unless my quick read through the thread gave me the wrong impression)
The meter tails from the fuse to the meter are the property and responsibility of the supplier and not in our remit to alter
If the consumers tails are upgraded or changed and access is required to connect them,so be it,cut the seal and away to go
If you dont want to cut the seal,connect the new tails to the old via henley blocks and lodge a test form to the supplier,who charge about £ 16 I believe,to come and make the connection
I need to upgrade the tails between the fuse and the meter as well as to the cu as they are only in 16mm.
Last edited: