I need to feed a new board 50m away.
Iv been doing clacs 16mm drops 7.2v over this distance. Is voltage drop to point of origin?
Does this mean im going to end up using 25mm?
Sorry if am being stupid,been there for hours and had info overload today :S
Hes got 2 water supplys in his house(not bonded)
There are 3 CCU's with 3036 fuses.
I did a Zs test on 1 of the rings at it was 30 ohms!.
Its got board feeding another board feeding another, Mix match of cable between each 1.
the 1 on the end is fed in 6mm and got 10mm coming out to feed the shower!
Hes buying the cable for the job even tho i can get it cheaper(hes buying from screwfix)
Iv also told his what hes putting in his new extention is way over the top for the supply.
I got the answer "well its the same as what iv got in here" hes got a AGA in his house and a 7500w hob going in down the other end. No shower in his part and a 10.5Kw going in the other. And he wants to put a waterheater 10Kw and 2x 3Kw panel heaters!
Diversity dont even go there. Do i just walk away? He thinks hes been coned cos they want 1100 quid to put the supply in.
Any suggestiuons would be helpfull only just started out and its turning into a mare.
Iv been doing clacs 16mm drops 7.2v over this distance. Is voltage drop to point of origin?
Does this mean im going to end up using 25mm?
Sorry if am being stupid,been there for hours and had info overload today :S
Hes got 2 water supplys in his house(not bonded)
There are 3 CCU's with 3036 fuses.
I did a Zs test on 1 of the rings at it was 30 ohms!.
Its got board feeding another board feeding another, Mix match of cable between each 1.
the 1 on the end is fed in 6mm and got 10mm coming out to feed the shower!
Hes buying the cable for the job even tho i can get it cheaper(hes buying from screwfix)
Iv also told his what hes putting in his new extention is way over the top for the supply.
I got the answer "well its the same as what iv got in here" hes got a AGA in his house and a 7500w hob going in down the other end. No shower in his part and a 10.5Kw going in the other. And he wants to put a waterheater 10Kw and 2x 3Kw panel heaters!
Diversity dont even go there. Do i just walk away? He thinks hes been coned cos they want 1100 quid to put the supply in.
Any suggestiuons would be helpfull only just started out and its turning into a mare.