what documents should be completed after initial veritication? | Page 2 | on ElectriciansForums

Discuss what documents should be completed after initial veritication? in the UK Electrical Forum area at ElectriciansForums.net

I

Ian Smith

of the electrical installation. trying to find the answer on the internet but no luck so far. Thanks in advance.
 
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'

taken straight off the notes on back of the form
 
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'

taken straight off the notes on back of the form

He added a ring circuit?? Are you sure minor works Kate?
 
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'

taken straight off the notes on back of the form

Gosh, a new one on me. Is it a NICEIC form, as they think they make the rules!!
 
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'

taken straight off the notes on back of the form
Have you been drinking tonight by any chance, Kate?
 
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'

taken straight off the notes on back of the form

dont go there.
just dont.
;-)
 
Last edited by a moderator:
'The MWIC is intended to be used only for an addition or alteration to an existing circuit that does not extend to the addition of a new circuit'

Stated on the back of NICEIC MWIC.
 

Reply to what documents should be completed after initial veritication? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
265
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
756
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
740

Similar threads

  • Question
It can be easy to lose the sequence of things. If the fused spur has a neon indicator and this isn’t coming on then I wonder if -the original...
Replies
6
Views
911
Problems can arise when you get on too well then they think he won’t mind me doing a bit.
    • Friendly
    • Like
Replies
8
Views
435

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top