What would you do here. | Page 2 | on ElectriciansForums

Discuss What would you do here. in the UK Electrical Forum area at ElectriciansForums.net

Andy5678

-
Arms
Joined
Sep 21, 2015
Messages
346
Reaction score
238
Location
Scotland
Looking at this job, I haven’t touched anything yet so any faults you find are nothing to do with me.

The top switched fuse feeds a CU in the house.

The bottom one is old and the customer would like to use it for another CU in an out building. A 16mm SWA has been run to the box.

Now I am struggling how to think about terminating it all and doing a neat job.

First thing would be to seal the hole and stop the snails.

I’m not sure about using the old switch fuse as the holes cut out on the top don’t look right and is a cover missing? I have seen new ones of these available from wholesalers so that could be an option. But could be a tight squeeze.

There is room for a second meter box along side which could house the 2 switches or just the the second one and then would just need to worry about getting meter tails through.

Would like to hear your thoughts so I can come up with a plan.

Thanks.

[ElectriciansForums.net] What would you do here.
 
Nothing would be said,as a vast number of the people fitting them,would not be aware of a problem,if there were a nest of snakes at the bottom,and the top was on fire...

Well to be fair these meter guys are under pressure to fit certain number of meters per day. They don't waste time poking around the consumers side or looking for defects with the exception of gas leaks.
 
Well to be fair these meter guys are under pressure to fit certain number of meters per day. They don't waste time poking around the consumers side or looking for defects with the exception of gas leaks.

They have to fill in what I think is called a MOPs report which is a meter operators sheet where they note any defects or queries to the existing equipment. They waste a lot of DNO time reporting exposed conductive parts in the cutout, what the rest of us would call the pme terminal. Each report has to be investigated.
 
This used to be economy 7 where the CUs are remote from the meter box and so require KMFs due to distance.
The bottom one was for the off peak which has become obsolete probably due to gas central heating replacing electric storage heating.
That is a British Gas smart meter and electric is not their strong point.
 

Reply to What would you do here. in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
956
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K
S
Me personally wouldn't replace it without rcd protection.
Replies
7
Views
483

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top