D
devlin maguire
Hi All
PNB system, I,v been told by the supply company" its not a PME system," I have had to sink three extra rods to the seperate buildings on this farm to get good disconnection times does that make it TT ? I mean can you turn a PNB system into a TT at all, is it not a TT to start with as the company Earth is within the proximity of the pole mounted transformer, DNO are being very vauge about this
Mac
PNB system, I,v been told by the supply company" its not a PME system," I have had to sink three extra rods to the seperate buildings on this farm to get good disconnection times does that make it TT ? I mean can you turn a PNB system into a TT at all, is it not a TT to start with as the company Earth is within the proximity of the pole mounted transformer, DNO are being very vauge about this
Mac
Last edited by a moderator: