Who to complain to???? | Page 2 | on ElectriciansForums

Discuss Who to complain to???? in the UK Electrical Forum area at ElectriciansForums.net

D

Davidlee1983

Need help, this is gentoo contractors work after a combi boiler was installed. This job was bought off as complete, could you explain in detail all that is wrong. It is located below the stairs, in a cupboard that was in constant use and is easy to access. We have children living with us 11, 9 and 11 months. I would expect that people would lose there jobs for such shoddy workmanship, people need more respect for themself. The paperwork left for this work was addressed to a house one street over with the same number. Please and Thankyou in advance.

View attachment 35306

View attachment 35307
 
Tails are doing my head. Fully accessible location and fully unsecured. The kids'll be swinging off them. I would've :)

Edit : Just commenting on what I see in the pic, and not about how things may have got that way or who is to fix.
 
Last edited:
I do think we need to be a little less derogatory of this particular installer. It may be, until we are told otherwise, that they weren't the installers, but perhaps have carried out an EICR?

OP can you just be clearer, did this company install the consumer unit (CU) etc, on the date shown on the lid of the CU?
 
TNCS and the incomer has been bonded due to being an extraneous conductive part.
how can it be extraneous? extraneious is, by definition, metallic services which are not part of the electrical installation, likeley to introduce an earth potential
 
how can it be extraneous? extraneious is, by definition, metallic services which are not part of the electrical installation, likeley to introduce an earth potential

Systems for the distribution of electricity to the public do not fall under the scope of BS7671 and consequently out of the scope of the electrical installation.The sheath is going to introduce an earth potential.
 
Im confused as ths op says he has had a combi boiler changed and shows us a picture of an old wylwx db witn one new rcbo in it maybe they have had a eicr done and some rems done such as upgrading mains tails and fitting an rcbo , but who knows, . We nead to know what work has been done and by who ??
 
if its just the boiler spur thats been added, id say its not the neatest. Although zone wise he is in the clear, as for workmanship seeing as your rent you just have to put up with it. No point ranting and raving, i have seen far worse, plus by the time you fill the room with rubbish and junk it wont be an issue as with most cu's you cant get to the bloody thing....
 

Reply to Who to complain to???? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
570
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
999
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
938

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top