Hi all, some help please. Wiring boiler on y plan (new Drayton mid pos) and an old Honeywell 2 port. Hot water works fine ( through dual stat).cannot get boiler to fire on heating, checked room stat, mid pos opening but on orange sw/l to boiler only getting 60-68 volts so obviously boiler not firing, have double checked all connections and been there far too long !!!!!! Any suggestions much appreciated cheers