So in the scenario i have posted and the scenario you have posted what would happen?

In your drawing, the customers incoming meter will read the same as it has always done, well, he will still be using the same 3KW to make your tea, but the 1kw of pV will run through his incoming meter along with the 2kw from the grid, so no gain.

If pv is installed after the incoming meter, then the meter will only clock up 2kw,
so as I said, your cup of tea is 1/3 cheaper.

How many sugars?
 
correct look that way to me so hes getting charged for producing his own juice so hes losing out the new consumer for the pv needs joining in between the supplier meter and the main D.B
 
In your drawing, the customers incoming meter will read the same as it has always done, well, he will still be using the same 3KW to make your tea, but the 1kw of pV will run through his incoming meter along with the 2kw from the grid, so no gain.

If pv is installed after the incoming meter, then the meter will only clock up 2kw,
so as I said, your cup of tea is 1/3 cheaper.



How many sugars?

I must be getting tired now because it looks like its 1/3 cheaper both ways! Going to bed now and see if brain works in the morning! Thanks for explaining it though.:smile5:
 
So it should be:?

[ElectriciansForums.net] From a non solar guy, does this look OK

If TT and TL inverter then bond array to earthing terninal, also if TL inverter may need a 100mA RCD as opposed to 30mA
 
Last edited by a moderator:
well, you risk opening a whole new can of worms there!!!
bonding, not necessarilly, RCD not necessarilly.
tails to existing CU 25mm if 100 amp fuse. If using a sub board you can use 16mm from the henley block to the sub board but fuse to block and main CU must be 25mm.
 
sorry, didn't see the TT bit, must be getting tired! yes he will need an RCD. He might get away with a 30ma, worst case scenario is nuisance tripping of the pV circuit (must be on it's own dediacted RCD, not shared with anything else). It's open to debate wether that needs to be a type B RCD rather than the more usual Type A.
You don't necessarilly need to bond a TL inverter, it depends on the specific model. SMA TLs don't. It's been discussed previously at length on here so I don't want to hijack the thread about it, as I say, it's a whole new can of worms. I've now had 2 different asessors tell me that.
 
Last edited by a moderator:
Just to add to my problems, what do i put on my EICR?

Put in comments box on exhisting installation
microgeneration photovoltaic system installed incorrectly at the mains and client who owns the roof space not benefiting from free electricity being generated from the system.
 
Had the camera today, thought you would be interested! We have no warning labels at mains position or in loft space. As you can see we have the spaghetti in the roof space! What do you recon?


[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK[ElectriciansForums.net] From a non solar guy, does this look OK
 

Reply to From a non solar guy, does this look OK in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
288
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
790
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
811

Similar threads

This was posted this week, on topic ....... https://niceic.com/newsletter/omission-of-overload-protection/?dm_i=7G1W,7GCE,K4L2A,WHET,1
Replies
8
Views
701
In the 80's I was taught that with PME earthing arrangements we used 16mm for the main earthing conductor, some went a bit crazy and were bonding...
Replies
11
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top