Search results | Page 2

Search results

  1. S

    timer and pir

    hi custumer wants a timer to keep security lights perminately on till 11, then a p.i.r to switch them on after 11 when activated, got any ideas or could someone be so kind as to draw a diagram. thanks
  2. S

    timed spur

    not for that price i don't, cheers anyway
  3. S

    timed spur

    customer already has a timer and wants it surface mounted
  4. S

    timed spur

    so it's ok to do as long as an f.c.u is connected 1st
  5. S

    timed spur

    hi is it ok to spur off a socket into a timer then into a socket, so that socket is on a timer for 12v lights. the timer is 230v rated
  6. S

    pir code

    i would like to add new board but dont want her to think i'm ripping her off for something that has worked fine
  7. S

    pir code

    yes it's an old style quickline
  8. S

    pir code

    just had a quick look before i start, cooker was a 6mm
  9. S

    pir code

    hi what code do u think for cooker sharing 32A mcb with ring main and 3 lighting points taken off a 10A mcb. thanks in advance
  10. S

    convincing customer to have a rewire

    yes i will do that, i dont want to go down the road of danger notice as it's his house and his choice
  11. S

    convincing customer to have a rewire

    hi custumer has certain lights and sockets not working, cast iron fuse boxes, no main earthing conductor, all earths twisted and connected to cast iron fuse boxes, live wires sticking out of junction boxes. and i was only there for half an hour. tried to explain the advantages of rcd's and the...
  12. S

    your opinions please

    but if there is no earthing conductor and no earth going to the main distributers facility there cant be an earth, all there is is the c.p.c's. and yes i agree the last spark should've spotted it
  13. S

    your opinions please

    there is no form of outside earth, no earthing conductor, or protective bonding conductor, but the gas and water is plastic. should've been done years ago. she had a new shower circuit wired in 3 tears ago, installation prob 25 years
  14. S

    your opinions please

    custumer hasn't got a lot of money, shall i arrange for dno to p.m.e at the cost of 175 plus vat or tt it. i know p.m.e is far surpierier just looking for opinions.
  15. S

    calculation question

    that helped a lot, thanks
  16. S

    calculation question

    how do you derive the volt drop from the resistance value's, i was using mV/A/m
  17. S

    calculation question

    yes but you can have 13 100w bulbs on a 6A, that would be 5.65A
  18. S

    calculation question

    hi the osg say's i can use 56m of cable of 1.0/1.0 installation method 103,101 e.tc. for lighting, on a radial at 6A. the mV/A/m is 44. so 44x6x56/1000=14.7v that is 6% of lighting not 3%. what am i missing
  19. S

    continuity test on rfc

    i will try tomorrow, it must be the problem thanks
  20. S

    continuity test on rfc

    yes and the same for r1 and rn. all IR results are good also

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks