  1. S

    Loss of power in Kitchen + MI

    First I would bell all the cables, find your faults and rectify if possible. If the customer wants a fuseboard change, You could probably get a metalclad board of your choice and put it into the place of that one and re-pot the pyro as necessary, the advantage being that modern units are much...
  2. S

    Eicr

    Yep unsatisfactory
  3. S

    First time for me

    DIY- they obviously thought the sleeving provided some sort of vital electrical function
  4. S

    supply fuse heads left open

    ^^^ That's what the DNO would use, get them back to do it proper!
  5. S

    Eicr

    Yes that's correct, it could be rectified by stringing around a bit of 4mm!
  6. S

    Smoke detectors my first post

    I would put them on a local lighting circuit, saves rcbo's, makes customer switch back on if fault etc etc. However neither way is really wrong as they do have backup batteries and will beep irritatingly until you put the power back on, as has been said.
  7. S

    RCBO fly leads

    I do have a set of boolace crimpers and I ain't afraid yo use them!
  8. S

    RCBO fly leads

    fair enough mate, I value your opinion and everyone else's, that's what the site is for! :-) I ran out Of smokes this morning so may have Been a bit sharp! as an aside note, when installing new ccts. I would always IR them before connection, but I will stand by the global IR as a good method for...
  9. S

    Insulation resistance testing

    you won't have to monitor it, there is nothing to monitor, I wouldn't waste another minute of the poor customers time!
  10. S

    RCBO fly leads

    it isnt a cop out it's a recommended method, it can only be done in installations where you can have everything off/ unplugged at once, which limits it to domestic, which is all this thread was ever about! Even when you do it by the book you can't do it right according to this site lol
  11. S

    RCBO fly leads

    would agree with you on that one, global IR is pretty much confined to domestic, i cant think of many times on a commercial or industrial test that I've Been able to remove every load/ fly lead etc at once lol
  12. S

    RCBO fly leads

    the same figure for all circuits, i believe it is actually recommended to do a global IR test on an eicr when practical
  13. S

    RCBO fly leads

    on a domestic db, I would do a global IR test usually and only breakdown to individual circuits if problems are found, on a 3 phase db, I would test individual circuits, I was only referring to new all rcbo domestic db's with regards to grouping the flyleads anyhow :-)
  14. S

    RCBO fly leads

    Although I would have agreed with you until recently engineer, its not until I had to do a few EICR's when you have 10 RCBO's in a small placcy fuseboard and have to undo every cpc termination to do my IR tests and then redo them (some inevitably need re-terminating as well) that I thought any...
  15. S

    Incomer

    And your sure the tails don't come from another cutout in the downstairs flat? Used to be common round our way to have 3 storeys blocks of flats with 3 phase cut-outs downstairs with L1 going ground floor L2 going to 1st floor (usually pyro) and L3 going to second floor (usually pyro).
  16. S

    Incomer

    Basically, you mean that rather then a concentric cable supplying the cutout, there was tails? If this is the case, there will be a ryefield unit in the block of flats somewhere, if its a particularly scummy block it could be screwed into a riser, or locked under communal stairs etc. The...
  17. S

    RCBO fly leads

    I have never quite understood the need for them anyways, as all rcbo's will test fine with them disconnected? Looks like another string to the BG bow!
  18. S

    Main Supply Conductor question

    As long as the cables are correctly sized for as you say they are I can see no problem with this setup, It would be more useful to be able to isolate each panelboard supply cable individually but Its not a regulation as far as I know.
  19. S

    RCBO fly leads

    I like the term 'bungled', makes me sound like a right bodging *** lol. I just think it makes sense when thinking of future EICR's on properites although it may sound a bit rough

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top