Search results | Page 9

Search results

  1. markythesparky

    motor call

    Hi guys, Could you clarify some thing for me? If I've got an 1100w 230v motor running a pump, but don't know the power factor as its not listed on the rating plate, how can I work out overload rating?
  2. markythesparky

    three phase rcd

    Hi guys. Can anyone explain in simple-ish terms how a three phase rcd measures a currents imbalance? It can't be between phases as not all three phase systems are balanced equally so it must be between phase and neutral big how? Just curious!
  3. markythesparky

    £50 a year for certification???

    I know that there are some schemes that allow third party certification. I do not agree with it at all as firstly why would I want to sign my name to a job which I didn't do? Also if you are carrying out third party certification you would need to visit the job a crucial stages just as the LBC...
  4. markythesparky

    Good old NICEC at it again

    They won't go down the pan unless we start going elsewhere. And we won't go elsewhere until specifiers loose their ignorance.
  5. markythesparky

    Good old NICEC at it again

    I rest my case m'lud! (Previous posts)
  6. markythesparky

    Quoting for works - How do I challenge NIC/EIC stipulated on requirements

    absolutely! And this is what the others need to take on board.
  7. markythesparky

    Quoting for works - How do I challenge NIC/EIC stipulated on requirements

    You are correct to a point. A lone individual cannot change the world but a group may well be able to. The view that I will go with the other because that's what the others are doing is similar to the lemming jumping of a cliff. It will take more than one to break the ball and chain.
  8. markythesparky

    Quoting for works - How do I challenge NIC/EIC stipulated on requirements

    Yes another bug bear of mine: It was the electric safe register and the electrical safety register then the competent persons register. The charity that the NIC profits fund was the Electrical Safety Register but is now called Electrical Safety First! How many of you know that? More to the...
  9. markythesparky

    Quoting for works - How do I challenge NIC/EIC stipulated on requirements

    No I can't but you are missing my point. It's because the others aren't advertising properly. At the risk of repeating myself, the NICEIC has had 60 odd years head start. The attitude you have will not help any of us as the NIC will only get worse. A monopoly is not a good thing.
  10. markythesparky

    Quoting for works - How do I challenge NIC/EIC stipulated on requirements

    Exactly! Through ignorance or misinformation.
  11. markythesparky

    Quoting for works - How do I challenge NIC/EIC stipulated on requirements

    It's all about advertising and let's face it, the NICEIC has had somewhere in the region of 60 years worth. As I have said before,the architects, local authorities etc etc are either ignorant or misinformed and the smaller schemes need to get their names about more and inform these...
  12. markythesparky

    NIC Rip off

    Job specifiers probably.? The other schemes need to get their act together and push their own Part P schemes. Let's face it, the NICEIC are not brilliant at advertising themselves, they've only had sixty odd years and they never got as powerful as Corgi did. The number of clients I deal with...
  13. markythesparky

    High zs readings low ze readings

    Yes. And to repeat, the RCD won't increase earth loop through the CPC. Im thinking there is a possibility of it through phase resistance as the phase conductor is connected to the RCD, the earth isn't!
  14. markythesparky

    High zs readings low ze readings

    Are you thinking a high resistance on the phase?
  15. markythesparky

    High zs readings low ze readings

    Never come across that, especially with Hager. In any case I'm not sure it would ever be acceptable or even possible for any RCD/RCBO to increase earth loop. How it would even do that as RCD's monitor an the balance between phase and neutral and don't monitor the connection to earth. Yes...
  16. markythesparky

    Fluorescent fitting to bright

    Sell your client some Ray Bans!
  17. markythesparky

    Hot tub installation upgrade of cable help please

    Or an approved electrician from another Part P body!!!
  18. markythesparky

    NIC Rip off

    I take all the above on board although some of it is slightly off topic. My point is that I don't have a problem with a full days visit (if it is really warranted), any inspector assessing my work, or any inspector choosing which work see. What I do have a problem with is £388 for what...
  19. markythesparky

    NIC Rip off

    what happens to the poor clients who have arranged to take time off to let you in, in the case of domestic work?

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top