Search results | Page 5

Search results

  1. Les Macaulay

    2 core cable..

    spinlondon is talking sense. To avoid bad job relations with the tester, change the cable to 3core but make sure you insulate the end of the cpc after sleeving it, or better still over-sleeve it. You are perfectly correct installing the 2core, but the tester is trying to be pedantic and...
  2. Les Macaulay

    replacing a ballast

    Something's not right! Take the fitting down and into your local trade counter and get help with correct parts. They should offer the correct parts or verify that you have already got the right parts. Other sparks at the counter should help. Did you say you got no installer's leaflet? Cheers Les
  3. Les Macaulay

    24v Fire Alarm Needs to Switch 240v shut off valve/Solenoid

    I'm surprised a 20 year experienced spark is asking this. Get a hold of the fire alarm guy on site and hand him a sheet of paper and a pen. He will sketch the circuit in minutes. Write back to [email protected] for a diagram. Cheers Les (ex-F/E Lecturer)
  4. Les Macaulay

    Solar pv schematic

    Interested to view sample [email protected] Thank you
  5. Les Macaulay

    Trainee Section on the forum: I'm looking for some experienced sparkys

    My electrical installation knowledge is Scotland based only, but I am willing to help. Help would extend to theory as well as practice.
  6. Les Macaulay

    Solar pv schematic

    From what I've gathered since I posted the query, the supply from the pv side is connected to an mcb input terminal. This allows isolation but it is the only time an input supply is ever connected to the load terminal of an mcb! I worry as to what a spark who isnt aware of this might do while...
  7. Les Macaulay

    Plead for 2.5 sq mm stranded

    For the older sparks, do you feel as I do, that the move years ago to do away with the equivalent of 7/.029 cable for ring final circuits was a bad move. I feel that 2.5 sq mm single stranded, is far too rigid for the purpose. Would love to hear the consensus of opinion from you all. Les
  8. Les Macaulay

    Ring vs Radial

    Those of us sparks old enough would not mind rings if it wasn't for the phasing out years ago of 7/.029 and the intro of single strand 2.5sqmm conductors.
  9. Les Macaulay

    Ring vs Radial

    The main objection to the ring final circuit is the time and bother to test (and I don't mean simply testing for continuity of each leg of the ring). Extra work , extra time and I wonder if it's being done properly.
  10. Les Macaulay

    Solar pv schematic

    Many thanks, goodwilld. Is the supply into the consumer unit from the Inverter side simply paralleled up with the mains supply? Les
  11. Les Macaulay

    Solar pv schematic

    Hi Goodwilld. I would also like a copy if you have the time. Thanks in advance [email protected]
  12. Les Macaulay

    30 metre run of Main Protective Bonding Conductor to Gas Main and Water Main

    Hi Fellow Sparks. I have to install a 30 metre run of Main Protective Bonding Conductor to Gas Main and Water Main in a commercial building. Is it permissible under the IEE Regs to clip a single 10 sq.mm PVC cable directly to the building surface for this, or should it be enclosed? Also...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top