DNO fits Cut out and seals, MOP fits meter and DPI but leaves CU tails disconnected, seals everything except DPI load terminal cover is plastic seal. Cut out to meter tails normally 3 metres maximum. Electrician then tests and connects to DPI.
Don’t worry about the frequency, if you look at most domestic electrical appliances it will state 50/60Hz. I’m not going into AC theory but in the USA they use 60Hz while here in the UK we use 50Hz nominal frequency.
Take a look at this, 300W is adequate.
View: https://www.amazon.co.uk/240v-110v-Step-Down-Transformer/dp/B000NIYH94/ref=sr_1_10?crid=FQFYHKTP0KZK&dchild=1&keywords=step+down+transformer+240v+to+110v&qid=1588342143&sprefix=step+down%2Caps%2C170&sr=8-10
The old MK1 hybrid colour TVs with the decoder boards that the colour dropped out all the time, croc clip across the test pins and turn the trimmer for the slowest Hanover bars. Rediffusion cable TV IIRC had 10V or 14V DC on the vision channels and 50VDC on the radio channels. It will be well...
Whole current meters generally have a maximum current limitation of 80A per phase, fitting 100A cut out fuses would exceed that unless you are using CT metering.
I would initially contact the manufacturer (link below) and ask them what the power consumption of the device is. Once you have that information you will be able to purchase a suitable transformer to convert the unit to run off the UK supply voltage...
Pretty sure there should be fuses fitted instead of red links looking at the MSDB.
Also wondering why the need for a 3 phase meter when it is only supplies a single phase for the landlord supply?
Not easy to see clearly but that looks like an E7 4 terminal meter which simply switches all circuits onto cheap rate at specified times. Normally with storage heaters a 5 terminal meter is used which via the 5th terminal only supplies power during the off peak E7 period normally to a separate...
Block of flats in Perth around New Year, riser fire took out the top 3 floors. Open Concrete walkways.
Fixing 100mm galvo trunking (which was hand balled up from the ground) to the ceiling of the walkways, never again will I touch unistrut, zebs or trunking again in my life. My arms still hurt...
Enjoying my last few working years on metering the usual customer question is “How long will the power be off.” My response is always “around 30-40 minutes but the good news is we don’t charge you for it while it’s off and if you want to put the kettle on before it does please do it now” This...
Frequency is set at the point of generation and remains constant along the distribution network, have you tried a substitute tester? The last time the frequency fell less than 1.5hz the network automatically began shedding load after 2 power stations failed.