Hi everybody.
Much unclear this sponsor thing for the ECS trainee card is.
I have done all required for the ECS adult trainee card.
I have done and passed my H&S exam. I am currently on my last "second" year of my level 3 in electrical installations.
Having been around to a few construction...
a poster on here has a pic of a german "officer" in his top half as his /her/3rd genger avatar
its offensive
i tried to post an avatar no luck
mine would have been quite the opposite of a 2nd ww thug
this would have been mine
Hi Guys
I saw the other day a Voltage Optimisation Company stating that you can connect and feed an inverter via an optimised circuit, are there any views on how this would be allowed under G83-2
Positive comments/statements about being a sparky and what you love about being a sparky!! ANYONE?! THINK! Encouragement and advice also welcome to the trainees of today who are interested and determined! Might provoke more people to ask questions that you want to answer. Surely you...
The EC appears to be clamped to the water pipe just before going outside to the spike. Was this ever standard? Its a TT with Ze of 36 ohms. Is it best practice to run a separate EC and water bod to MET. (no gas in house).
went to an office this week where there are 2 rcbo's nuisance tripping every now and then. apparently one does the floor sockets in the office and one does the wall sockets in the office, now as the office was full of staff working on their computers i could only go by what one member of staff...
Hello,
I have just moved into a new house, which will require a full rewire.
I am looking at relocating the main electrical consumer unit into the boiler room which houses the gas combi boiler.
Can anyone advise any regulations that would resrict this?
Thanks,
Callum
Hi chaps...
Been asked to add a light in an under-stairs cupboard.
A spur from the downstairs socket circuit runs through that cupboard to a double 13A outlet in the kitchen. I'd like to tap into that for the light, but under the regs I'd have to fuse it down first.
The thing is, the 2.5mm...
Similar to the two showers thread, sorry.
I have been asked to supply a sauna (4.5kW) and electric shower (7.5kw) lights and sockets (using an oil filled radiator) to an outside room.
The supply is TNS, 80A (presumed) and the existing split board has 3 RFC, 3 light circuits, 1 immersion heater...
Pricing up a job in a factory and have to wire in a 3 phase supply, just going to double check my cable sizing i calculate i need to use a 10m cable
Swa cable clipped direct on its own , 35m run feeding a unit needing a 3 phase 20amp supply am i right ? just seems a little on the heavy side ?
So we have been doing a bit of digging on the subject and it's apparent they are funded from company's in Germany so the fits are going out the country!! Surely this should not be allowed
For disconection times we have to hit 0.4 for up to 230v U0. 0.2 for 400-1000U0.
I always took this to mean what it says.
both single and 3 phase V to earth is 230, so we use the 0.4 disconection.
Taking my 17th update and got told that was a typo!!!!
So for 3 phase we are supposed to use...
I was doing a bunch of very dull office pat testing yesterday, 90% IT so hardly anything to do. It suddenly occured to me that as I could see everything bit of kit fully to be able to verify the visual condition, and I knew eveything was operable, if I just tested the via the plug on the end of...
This is something I have been racking my brain over for ages and its doing my head in!! :crazy:
Please could someone explain why you are only allowed to have one unfused spur per socket on a RFC?
I'll explain a little why I'm confused.
A ring main is allowed as many sockets as you like on the...
My cleint has a small holiday lodge and wanting to remove hot water cylinder and night storage heaters and replace with instanious water heater and panel heaters. As he is only in lodge a day here and there.
The plan is to replace old fuse box with new 17th ed consumer unit. Which will include a...
Iv just been to look at a job in a cafe, the customer needs a cooker circuit and a radial adding the the installation, the 3 phase D-board is in the same room as where the two extra circuits will be.
All the circuits tht are already in this room, radial for boiler and radial sockets feeding...
Went to carry out condition report on a flat. There is no earth cables from fuseboard to first point . The installation is over 30 years old and other contractors have just added twin and earth under floors/walls. R1+r2 values seem to be high aswel. Zs is not so bad and is within allowed...
hi, im an electrician and i finished my 2330 just before the course changed. I am now unsure to what im physically allowed to do on my own.
I don't have my NVQ yet due to constant dodgy jobs such as un-qualified employers, being horribly under paid and just generally being mistreated. ive been...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc