good evening all!
sorry it is a late one. I have been doing a college assignment over the past 2 days which involves designing circuits calculating design current, volt drop and all that good stuff. One aspect is applying diversity. Now usually I am fine with this. I know to use table A2 of...
I am applying for the NEICE Domestic Installer scheme. I was an NiCEiC DI about 10 years ago and all they required was 2 pieces of work to see. Their website says that want to see the paperwork/evidence for all your electrical work over the past 12 months. I have been working for someone else...
Hi all,
so I've tried to apply for an ECS card but at the end it asked for the 2394 qualification, however when I looked at my certificates there's no mention about it. I called my college and they said that I haven't done the 607, but after speaking to my old lecturer he told me that my year...
Hi there Guys
Just need some advice:
Example: Company office to site is a 4hr drive. we stay over during the week and return on Friday with another 4hr drive. Company provides vehicle and fuel. 170 miles.
1.>Should we get paid our normal hourly rate plus the ammount indicated in the Travel...
Peter Hartley
Thread
application
card
certification
correct
jib
jib card
scheme
time
travel
With my NICEIC welcome letter there's a form in there for an ECS Part P application - doesn't have much information so wondering if anyone here can tell me what it means etc and whether they applied for it?
hightower
Thread
application
approved
attach
because
ecs
part
part p
schemes
I have been applying for the JTL apprenticeships via their website, My application is fully complete and I am also using the government website that shows JTL vacancy's and applying there too and was wondering if anyone from experience knows after closing date how long it takes or should take...
Hi All
I have just taken a job as a Product Manager at a company I have worked for for 20 years. Up to this time I have been in Logistics.
I have a good understanding of our product range and what we offer. What I am really desperate to improve on is my knowledge of how our customers apply...
Hi everyone,
Im applying for HNC Building Services and I need to enter my qualifications.
Ive completed a Modern Apprenticeship which incorporates a SVQ Level 3.
Should I put in the Modern Apprenticeship or just the SVQ or both?
Thanks! :wink_smile:
Hi,
just wanting to put a VFD on a lathe rapid traverse saddle, anyhow ever done this and does it work ok? it is a poreba lathe 12metre bed 1.1kw 3ph induction motor.
Hi to all,
Looking to open some extra doors for myself in the near future. I have heard through various people a 'Gold JIB' card could be beneficial to hold.
I work as a commercial spark in a maintenance role. I have been time-served and working in this role for 3 years.
I hold;
NVQ Level...
Hi there,
I am currently training to be an electrician and have a few queries about the ECS card application form.
1) In appendix C which occupational definition code do I use?
I am not employed at the moment and am 25 years old. I am leaning towards Adult trainee or installation electrician...
Hi All
New to this forum and fairly new to the business too.
I have a project I'm putting together which is an off grid house. There are two 5000VA inverters with sufficient battery size and a sizeable generator to switch in once loads exceed about 7kW, which will ADD a further 100A.
Here's...
MRL
Thread
application
disconnection
disconnection times
grid
off
off grid
times
Hi, just a quick question about the CSCS , 17th edition and JIB cards. I finished college a year ago and have recently been looking at jobs, many of them require a CSCS card , 17th edition and a JIB card.
I think the CSCS is a 1 day course and easy to arrange. I am not sure how I go about...
Hi everybody.
Much unclear this sponsor thing for the ECS trainee card is.
I have done all required for the ECS adult trainee card.
I have done and passed my H&S exam. I am currently on my last "second" year of my level 3 in electrical installations.
Having been around to a few construction...
What is the deal with temporarily moving an array to complete building works? No doubt it will be a complete nightmare but hopefully some good experience here?
Do they notify or keep quiet?
Hi all,
Completely new here this being my first post.
I have recently been offered a electrical apprenticeship with a local firm.
This is under the condition i pass a JTL aptitude/assessment test.
Does anyone on here have any advice they can give on what to study, what the test will entail...
You are probably aware of these Forms A, B and C on the MCS site:
Microgeneration Certification Scheme - Heat Pumps
which we have to complete prior to connecting a heat pump.
I want to put the application in early on one of my jobs because it is a largish heat pump and in a village and I want...
installed for a customer who has just sent off application for BG via email. He has had a automated email suggesting that they will respond to applications within 28 days - missing off the end of the month cut off.
Previous customers with BG had a very quick turnaround and i don't recall any...
Hi can anybody help me about this question? many thanks in advance . I found SWA and MICC cables but I don't know the following cables: explain the applications, advantage and limitation for each of the following types of cables. consideration for each should include: ambient temperature...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc