    Adding to Domestic

    i Have sold 3Kw to a customer who already has 3.25Kw on another roof. It is the first time i have had to pre notify the DNO so am unsure which forms i need and the cost involved as well as time. Its for SSE, he has a fronius 3.0 existing with 3.33Kw of panels i want to add 3 KW of panels with...
  2. D

    ECS Application Form HELP!!!!

    I hope you guys can help me with this. In a nutshell im applying for an ECS Card so i can work on site but im struggling with Section 10 EMPLOYER OR SPONSORED ENDORSEMENT AND RECOMMENDATION. Now its that vicious circle again, i need an ECS card so i can work for a firm but i cant get on a firm...
  3. Robertbaker63

    application for pme

    Hi one of my customers have contacted western power distribution about getting pme installed as there is no reading when an earth stake is installed they have done a site visit and have asked their electrican (me) to do send of a request form i have trawlled the website and cannot find the...
  4. H

    Application of Diversity - Standard Circuit Arrangements

    Hi there, this is a question I originally posted in the trainee sub forum which has been a little quiet of late. I know more traffic flows through here, so I'd be grateful for any corrections. In specific relation to the standard arrangements of final circuits in accordance with Appendix H in...
  5. H

    Application of Diversity

    In fact, in light of a recent thread I do have a question. There seems to be some conflicting information concerning the sequence to derive Ib. From a number of different online sources, actually. It has introduced an element of doubt, so I'd be grateful for confirmation and / or a correction...
  6. S

    SSEG Application for connection of multiple G83/2 installations

    Has anyone had to apply for the G83/2 yet for multiple installations? Just wondering if any have been refused, though it did come into force in one of the quietest times of the year,!
  7. Worcester

    2 x 3.68kW on two MPAN's or 7.36kW on one, Tale of a helpful DNO

    Interesting discussion today with WPD, (My favourite DN0 :) ) with regards to extending an existing 3.68kW system. One pole, two overhead wires (single phase) two connections at the top of the pole to two seperate supplies, one terminates at the base of the pole, the other 10 m from the base...
  8. S

    G59 Application for 2 technologys

    Hi All First time need your help with a G59 form, I have installed a 3-250kw Solaredge system last year, the customer has required us to install a new boiler Baxi Ecogen 1kw I have spoken to the DNO they have advised me to d a G59 application, do I need to do 2 G59 part 1a applications for each...
  9. M

    FIT application, whose responsibility?

    Been contacted by a couple who had pv installed back in November. The company who fitted them failed to a) make a FIT application on their behalf and b) failed to advise them on how to make the application themselves. They are still without a FIT contract when they should have been on 43p. Does...
  10. G

    EDF not recieved paperwork, but FIT application.

    Customer just rang, was at work so not got all info, but the jist is he said there was a problem getting his FIT payment as EDF say they havent recieved the paperwork, i think they have received the FIT application forms because i emailed them, i think its the PV commission sheet and Electrical...
  11. O

    Mobile application development

    Hi all, I am developing an application for Android. I use an SDK and Adobe Flash Builder to complete this task. There is a page that offers relevant information about this topic. Also code snippets that handle the physical buttons and the rotation features of the mobile devices can be found...
  12. G

    EON fit application nightmare! 8 months and counting....

    Right, I'm getting seriously hacked off with EON. I have three customers (that I know off) that have yet to receive a penny from eon. One from November, one from Feb and one from march. Two of them have been made to re-apply as eon claim to have lost their form and the other keeps hearing that...
  13. M

    SSED G83/1 Application Form

    Dont spose anyone has a spreadsheet version of this form do they? Id prefer to have it as an electronic copy rather than a hand written one if possible. I'll make one if I have to but I was wondering if anyone was kind enough to share theirs.:teeth_smile:
  14. S

    How to estimate loads for electrical application (UKPN)

    Hi, I am dealing with alot of applications to UKPN. What would be the best way of estimating loads for this application. Am i right in thinking that for an office environment, going by the BISRA rules of thumb: Lighting 12w/m Power 15w/m Heating 70w/m Cooling 125w/m multiplied by the floor...
  15. R

    Need your help with a software

    Hello, I am interested about building an own application. I am not a programmer and only know a little about C. I have found a good site that offers several solutions. Basically it is about how you can build an own application with an SDK called Ozeki VoIP SIP SDK. It is written in C# and that...
  16. SolarCity

    ENA G59 application form help

    This file should help out anyone that has had trouble filling out the ENA G59 application form. It has explanatory notes which should make things a little clearer. You can ignore section 2 - It is not relevant to G59 PV applications.
  17. G

    G59 application form

    Up to now we've been using the G83 stage 2 application forms for up to 50kW under the relaxation ENA had put in place, but I've just been told by ENA that we do now have to use the G59 form, which I've always found very confusing and not been entirely sure what information we're supposed to be...
  18. S

    Planning application - Design & Access statement

    We have submitted a planning app for a barn roof and have been asked to submit a Design and Access Statement, after reading the first few pages it seems to suggest you need this if you are constructing new buildings. We are also being asked to pay £330+ for the application which seems a little...
  19. P

    Mains meter going backwards

    Installed 12 x 2.5Kw LG panels in December and they seem to be doing well (two arrays - 6 south facing and 6 west on four roofs). Happy to report that a mains meter reading taken today is at the same level as end-March, and that's apart from the FITS payments! With this current hot spell pretty...
  20. J

    Correct application of diversity, separate hob/oven on single feed.

    Hi,he What is the correct application of diversity, when a separate hob and oven share a single feed. As far as I see it, electrically they are the same as a free standing cooker - or does a cooker have a limiting mechanism to prevent all circuits from working at the same time. Hob is 6.7kw...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Advert

Back
Top