I submitted my FIT application via email / online to Ecotricity on a Wednesday evening, they contacted my the next morning to tell me I had missed some parts of the declaration and they wanted proof of address as I wasn't an existing customer. Sorted it out the same day.
Had an email by Friday...
installed for a customer who has just sent off application for BG via email. He has had a automated email suggesting that they will respond to applications within 28 days - missing off the end of the month cut off.
Previous customers with BG had a very quick turnaround and i don't recall any...
Hi can anybody help me about this question? many thanks in advance . I found SWA and MICC cables but I don't know the following cables: explain the applications, advantage and limitation for each of the following types of cables. consideration for each should include: ambient temperature...
im in the middle of filling out my application im a little stuck on section 9 "employer or sponsor endorsement"
im going for G318 Maintenance Electrician, I have NVQ 3 In engineering maintenance electrical, 17th edition, C & G 2330 Level 3, BTEC National in electrical engineering Level 3, NVQ...
i Have sold 3Kw to a customer who already has 3.25Kw on another roof. It is the first time i have had to pre notify the DNO so am unsure which forms i need and the cost involved as well as time.
Its for SSE,
he has a fronius 3.0 existing with 3.33Kw of panels
i want to add 3 KW of panels with...
I hope you guys can help me with this. In a nutshell im applying for an ECS Card so i can work on site but im struggling with Section 10 EMPLOYER OR SPONSORED ENDORSEMENT AND RECOMMENDATION.
Now its that vicious circle again, i need an ECS card so i can work for a firm but i cant get on a firm...
Hi
one of my customers have contacted western power distribution about getting pme installed as there is no reading when an earth stake is installed
they have done a site visit and have asked their electrican (me) to do send of a request form
i have trawlled the website and cannot find the...
I am a Beginner.
I install a program ABB ACS800 ( Winder/Unwind , Application Program) .This inverter is used communication card to be run.
I want to upload program to this inverter.
This inverter program upload to another ABB inverter to download this program.
I want to change (99.02...
Hi there, this is a question I originally posted in the trainee sub forum which has been a little quiet of late. I know more traffic flows through here, so I'd be grateful for any corrections.
In specific relation to the standard arrangements of final circuits in accordance with Appendix H in...
In fact, in light of a recent thread I do have a question. There seems to be some conflicting information concerning the sequence to derive Ib. From a number of different online sources, actually. It has introduced an element of doubt, so I'd be grateful for confirmation and / or a correction...
Hi,
I am making a number of DNO applications and assesments on grid connection + costs etc for wind geniration 500kW++ If this is somthing that you have experience on let me know and we can discuss (ideally via my mobile)
Kind Regards,
Scott.
07825719337
Hi,
I am making a number of DNO applications and assesments on grid connection + costs etc for wind geniration 500kW++ If this is somthing that you have experience on let me know and we can discuss (ideally via my mobile)
Kind Regards,
Scott.
07825719337
Has anyone had to apply for the G83/2 yet for multiple installations?
Just wondering if any have been refused, though it did come into force in one of the quietest times of the year,!
Interesting discussion today with WPD, (My favourite DN0 :) ) with regards to extending an existing 3.68kW system.
One pole, two overhead wires (single phase) two connections at the top of the pole to two seperate supplies, one terminates at the base of the pole, the other 10 m from the base...
Hi All
First time need your help with a G59 form, I have installed a 3-250kw Solaredge system last year, the customer has required us to install a new boiler Baxi Ecogen 1kw I have spoken to the DNO they have advised me to d a G59 application, do I need to do 2 G59 part 1a applications for each...
Been contacted by a couple who had pv installed back in November. The company who fitted them failed to a) make a FIT application on their behalf and b) failed to advise them on how to make the application themselves. They are still without a FIT contract when they should have been on 43p. Does...
Customer just rang, was at work so not got all info, but the jist is he said there was a problem getting his FIT payment as EDF say they havent recieved the paperwork, i think they have received the FIT application forms because i emailed them, i think its the PV commission sheet and Electrical...
Hi all,
I am developing an application for Android. I use an SDK and Adobe Flash Builder to complete this task. There is a page that offers relevant information about this topic. Also code snippets that handle the physical buttons and the rotation features of the mobile devices can be found...
Right, I'm getting seriously hacked off with EON. I have three customers (that I know off) that have yet to receive a penny from eon. One from November, one from Feb and one from march. Two of them have been made to re-apply as eon claim to have lost their form and the other keeps hearing that...