  1. E

    JIB Electrotechnical Certification Scheme (ECS) ECS JIB Application

    Can anyone tell me which parts of the application for i need to fill out on the ECS-JIB, for electricians mate. I have City and Guilds Qualification level 2 in Electrotechnical Technology - Installation (Building and Structures) 100/3569/2 - J/102/3564 Practical - L/102/3565 Practical -...
  2. S

    How to estimate loads for electrical application (UKPN)

    Hi, I am dealing with alot of applications to UKPN. What would be the best way of estimating loads for this application. Am i right in thinking that for an office environment, going by the BISRA rules of thumb: Lighting 12w/m Power 15w/m Heating 70w/m Cooling 125w/m multiplied by the floor...
  3. R

    Need your help with a software

    Hello, I am interested about building an own application. I am not a programmer and only know a little about C. I have found a good site that offers several solutions. Basically it is about how you can build an own application with an SDK called Ozeki VoIP SIP SDK. It is written in C# and that...
  4. SolarCity

    ENA G59 application form help

    This file should help out anyone that has had trouble filling out the ENA G59 application form. It has explanatory notes which should make things a little clearer. You can ignore section 2 - It is not relevant to G59 PV applications.
  5. G

    G59 application form

    Up to now we've been using the G83 stage 2 application forms for up to 50kW under the relaxation ENA had put in place, but I've just been told by ENA that we do now have to use the G59 form, which I've always found very confusing and not been entirely sure what information we're supposed to be...
  6. S

    Planning application - Design & Access statement

    We have submitted a planning app for a barn roof and have been asked to submit a Design and Access Statement, after reading the first few pages it seems to suggest you need this if you are constructing new buildings. We are also being asked to pay £330+ for the application which seems a little...
  7. P

    Mains meter going backwards

    Installed 12 x 2.5Kw LG panels in December and they seem to be doing well (two arrays - 6 south facing and 6 west on four roofs). Happy to report that a mains meter reading taken today is at the same level as end-March, and that's apart from the FITS payments! With this current hot spell pretty...
  8. J

    Correct application of diversity, separate hob/oven on single feed.

    Hi,he What is the correct application of diversity, when a separate hob and oven share a single feed. As far as I see it, electrically they are the same as a free standing cooker - or does a cooker have a limiting mechanism to prevent all circuits from working at the same time. Hob is 6.7kw...
  9. S

    Quick reminder on Documents Needed for a 'successful' FIT application

    Feed in Tariff Form MCS Certificate EPC certificate*(if needed) FIT Generator Solar PV declaration. (attached to this post) Paid Invoice/Proof of Ownership
  10. I

    Special Delivery failure with FIT application

    I am trying to find other people adversely affected by the failure of Royal Mail's Special Delivery "service" to deliver a FIT application to EDF prior to the 3 March 2012 deadline. I would appreciate hearing from any one in this position.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top