Hi Guys,
I'm having a few problems identifying and replacing some mcb's/rcbo's from a water damaged consumer unit.
They are type C20 talisman plus but I can't figure out what size they are and have been told they are mem "2" ?!?
Now my normal supplier for standard stuff say they can get them...
Hey guys. Just a quick question here. I have only been self employed since April. I am registered as a Sole Trader under the CIS Scheme. I keep hearing on the radio about how we must now do our self assessments. So I registered for self assessment and was waiting for an activation code through...
when testing a lighting circuit say we get a reading (r1,r2) of 1.10 the by using ohms law we work out the ampage, we
get 230 divide by 1.10 when gives 209.09 amps. but it is protecte by a 6 amp mcb, where am i going wrong
Hi folks. My house has Econ.7 therefore I have 2 consumer units. Is it possible to incorporate the heating board into the main board. I don't do any domestic stuff. I've seen dual boards and split boards but I'm cofused as to what the difference is. For example can I buy a dual board and...
Hi All
Been working away in Europe for 5 years and now returned to UK. I have got 16th edition and Test and Inspection and will be taking update course for 17th edition shortly. What do I have to do to be registerred to sign off and certificate own and others work. I assume need to enrol with...
The PSSC of a final ring circuit is 2KA so what is the min CPC size?
For PVC singles k = 115
CB 32A (BS EN 60898) will disconnect in 0.1 second
Fault current of low impediance = 2000A
S = square root of PSSC x PSSC x disconnection time (t) / Cable constant (K)
CPC size = 5.50mm (6mm cable)...
Hi guys,
I popped in late yesterday to change two 3 pin bayonet energy save fittings to a couple of fancy fittings for a mate in his 'L' shaped hallway. Both lights are individually switched at either end of the hallway.
I don't do much domestic sparking as am a facotry spark so never really...
I have a TNCS system in my ten year old house. I have a distribution circuit running to my detached garage 4 metres away via SWA. The PME is not exported to the garage but it has a separate TT system. My question is:
How is ZS measured at the DB in the garage and how can I check the earth...
alrite fellas, wondering if someone can enlighten me.
domestic property
very small 2 bedroom house
had rat infestation now rats have been evitcted lol
all results have been tested twice and then tested again with another instrument all calibrated etc
cables have been knawed etc, inspection...
Why is it that when you click on 'new posts' the list that comes up is different to 'quick links' 'todays posts'. I would have thought they are the same thing.
I need to buy a 3 phase HV transformer for an apartment block
1382 Amps is the total predicted single phase load after diversity.
1 Phase KW
1382 Amps
230 Volts ( I/V)
317.86 KW
KW 1 Phase KW to KVA
317.86 KW
0.9 Power factor ( KW x P.F. = KVA)
353 KVA
KVA Single Phase to 3...
Im looking for an overview on 3 phase power transmission and would be grateful if someone could answer this;
Does the current originating from an ac generator at the power station eventually return to the generator star point . Im confused because Ive read that the return path for current is to...
hello guys, I'd just like you opinion as to whether I understand supplementary bonding.
To my mind supplementary bonding is additional protection to ensure that the voltage between extraneous and conductive parts does not exceed the safe voltage limit of 50. Therefore if you check between...
Morning I have Ten ballasts to install and the customer picked these up for me , but I'm not sure about these . surely there should be 3 in (L,N,E) and 4 out (to the tube)?? there only appears to be four connections in total. Prob simple for yourselves
Cheers
can anybody help me?
i have been contracting to companys for the past three years and i am thinking of advertising and starting up myself. when i have done work for the companys they tested and notified building control, what i need advice on is if i do notifiable work what would i have to do...
Say I have applied to go the napit scheme or similar. What would I do about notifiable work before my assessment ? Do I send in a building notice to labc or do the work and use it as my assessment.
hi everyone. unsure if this is 100% right forum but basically i did a JTL apprenticeship from school.
ive moved house and have just received my replacement certificate that was lost in the move. i seem to need this certificate to do the 17th edition?????
anyway on my cert it says: "level 3...
Hi guys to become an electrician I followed this route:
2330 Level 2 (2 years)
2330 Level 3 (1 Year)
2391/2 Inspection & Testing (5 day course)
Working at Height and Haul Rescue Training (5 Day Course)
PASMA Advanced
2356 NVQ Level 3 Electrical Installation (1 Year alongside 2330 L3)
AM2 final...
I have no previous electrical experience but wanted to complete a full house installation for my self build.
I understand that I can do this but would need to get the LA to check and sign off the work.
To try and help understand a little more I enquired to complete a Domestic Installer...