Hi All
I am quoting a customer for a 25kw system on a commercial property.
The property is used as a gym and has very high electricity use.
Initial calculations estimate 95% self generation with the 25kw system.
My question is, will my customer still receive deemed export payments of 50%...
is there any way to print graphs from solaredge monitoring portal? The only way i found is printing the whole page from browser but this is not useful. i also want to keep some more statistics such us power production of inverter or a panel individualy. Portal's statistiscs is for the cow!
Hi
I believe the 'approved' method for quoting payback amount and time is using a deemed export of 50% and the other 50% as electrical savings. I'm now considering doing quotes maintaining the deemed 50% export figure for income but an actual export (or electrical savings) of (say) 25% when I...
Dear all I wonder if you can help please:-
I have a customer on a farm who has 3 x 5 total 15Kw of wind turbines installed foc by wind crop, I am assumining windcrop claim the deemed export rate of 50% of the wind FIT meter reading.
The customer has now been in touch with me as he would like...
This has probably been asked before by a newbie like myself but I couldn't find it. Given the readings from the supplier/dno meter and the generation meter. How can they work out how many units are exported. With no meter actually reading what is consumed by the installation I can't see how they...
I wanted to see what my solar equipment system was doing in real time when my system was installed so I brought a solar-log 200 web/wireless monitor which connects to my Fronius 15 months ago
I found a brilliant android app called solaranalyzer (spellings correct) yesterday from play store...
Hi can someone please let me know how the electric is pushed back to the grid,or is it stored in the export meter for meter reader to calculate reimbursment thats due,Thanks
Hi
factory unit with 800 amp supply 95 mm main earth and 50 mm main bonds
portakabin has been delivered as a permanent addition
wired on 10 mm 3 core swa and 32 a commando plugs
there is a water supply and metal parts.
am I right in saying that it will need to be put on a stake as the main...
So guys I know that this is a frequentley asked question but which way would you do it?
The building that requires power installing has extraneous parts by the way.
Would you.
1. Devorce the PME earth from the house and install a spike.
2. Use the PME earth from the house within your...
Just looking for some advise on export control. We have a single phase supply and looking to install a 50kw solar PV system but the DNO are restricting what we can export. This leaves us in a predicament and they have suggested we use an EMMA unit with export control made by coolpower or upgrade...
I had my 4kw solar PV system installed in July 2011, I am aware of the FIT Generation Tariff rates but there isn't anywhere clearly showing what the Export rate is, I thought it started at 3.1p does anyone know what it should be now for my system and will it increase to 4.5p in August or is that...
Does anyone know what happens to the export tariff after the FIT period on an installation expires?
Could an installed 50kWp system carry on selling the generated electricity after the fit contract expires (ie 20 years)
Thanks for your replies in advance:yes:
Hi All.
New poster here and I'm posting because of the bewildering amount of differing information I'm finding on the internet.
My question is; How do CT transformers on the PV 'out' and the import meter 'in' know if there's an overall excess of deficit?
I've been looking at the Owl Intuition...
its advised to install an earth rod not compulsary unless there is a window in the roof where direct contact could occur, there is argument that bonding class2 equipment could cause a potential too.
if the array is not accesible i wont be installing any earth electrode in these circumstances as...
if you need an export meter, it all depends on your preference. You have to weigh up weather its of cost benefit for you to pay to have an export meter installed against the cost saving of your export tariff. Usually 30KW is when the customer would start to look at having an export meter...
Hi after some wise words.
We have got a 40Kw install to start in 2 weeks, just a bit unfamiliar with the export.
Can some one confirm the procedure we have had acceptance of our G59 Application with the DNO no witnessing required G59/2 Inverters.
Does my customer have to have an export meter...
Had a long call with a FiTs guy at SSE this afternoon.
They (and I'm guessing all other suppliers too) are going through all their FiTs systems that are registered with export meters and checking that they have MPANs for the export meters. They believe that an OFGEM audit on them will be...
I have a recurant problem on a system which one inverter gets a AC fault. This happens alternately, either one inverter or the other. The fault seems to be at peak output but does not trip any breakers. The system is very wrong in the fact its all on the one phase (as only one available), but...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc