mcs | Page 2

mcs

  1. S

    Mcs Sign Off

    So I've just fitted a 12 panel system to my own property in Leicester. I'm 2391 inspection and test qualified but don't really want to go to the expense of doing the course to be mcs as I am already to busy and don't see the market growing now feed in is so low. Is there an independent test...
  2. G

    NAPIT demanding we reconcile all our MCS certs with building regs notifications back to 2010

    Has anyone else had this demand? NAPIT are now attempting to insist that we need to go through our records of hundreds of installs since 2010 and fully account for a 15% discrepency between the number of MCS certs issued and the number of building regulations notified via NAPIT. The vast...
  3. Worcester

    MCS Publish QMS !

    Thinking of getting MCS certified? The Microgeneration Certification Scheme aka MCS have now published their own QMS, so i guess if you follow it you should be compliant. (well maybe !) Microgeneration Certification Scheme - QMS Templates -...
  4. S

    Amending an mcs cert

    E.on have just discovered that a job we registered back in December 2011 had the wrong meter serial number on the certificate. Are we allowed to update the certificate to show the correct number? Tia.
  5. S

    MCS Commissioning date - amended?

    Hi, Can anyone tell me if they have ever applied to MCS to have a commissioning date amended? I need to alter the date of a Certificate for a system commissioned earlier in the year and it just needs changed by a few days. Has anyone done this before? Is it straightforward? What "excuse" did...
  6. Dan

    MCS Companies List

    Can you reply with all the MCS companies you know of and I'll update this first thread periodically.
  7. Worcester

    Qualifications challenged at MCS Renewal ?

    Thought I'd trigger a discussion here, as our assessment is due in 4 weeks time! What experience has anyone have about needing / being required to attend refresher courses etc? p.s we're with Napit for PV, Thermal, Biomass and Heat Pumps...
  8. C

    Electrician Jobs Electrician Need For Test&sign My Diy Pv Sys, Don't Need Mcs Reg, Ashford, Kent

    Hi everybody, I'm new here and possible my last chance to find somebody to test and sign off before I starting to convert my system to island system. My original plan was a grid connection but I'm loosing my hope to find an electrician in Ashford, Kent or surrounding area to test and sign off...
  9. SolarCity

    MCS inspection

    Just had ours and we've had a couple of things highlighted. First of all, I need to refresher training. No idea why this should be. I do the job every day so I can't see why I need to pay out more money and lose another day. If I can't do my job properly, then surely this would show up...
  10. M

    MCS 012 fire rating in roof systems

    Hi All reading the guide it mentions performance of different panels & how they react, Maybe with all the guidelines & standards we have to adopt they should have had more stringent standards on the panels in the first place & then they would not need the requirement. Evidence has emerged...
  11. G

    31st March deadline for FIT applications for systems with MCS cert issued <16th Jan

    Leeds Solar have just become aware that on 10th March DECC slipped in a Statutory Instrument that takes effect today (31st March 2016) that results in the following urgent issue. All existing renewable energy installations with an MCS certificate issued before 15th January 2016 must submit...
  12. M

    Battery Pv Battery Storage & Mcs

    HI all just got update in which they mention the following for battery storage. Since the Solar PV Tariff drop, battery storage has become a way to combat the cuts by storing theenergy from the Solar PV installation and using it during the evening or on-peak tariff times. We areaware that...
  13. L

    Installing PV non MCS

    Hope somebody can help I am a time served sparks and a PV installer with all the relevant qualification. I have installed around 250 PV systems and signed them off as I m NICEIC registered. The MCS was dealt with through the companies I was installing for. So here is the question- As the...
  14. SolarCity

    >50kWp installs - MCS panels?

    Currently in the process of bringing some panels in from Europe for an 80kWp install. One of the guys I'm dealing with is offering panels which are not MCS accredited. As this is greater than 50kWp, do they need to be? Or is it still a requirement for the tariff? Any info on this would be...
  15. S

    NoSolar PV MCS certificate and original installers aren't allowed back on site

    Solar PV Installation. For reasons I can't go in to, the original installers aren't allowed back on site. The MCS Cerificate has not been issued. Is there any provision for an MCS certificate to be issued by a third party, effectively taking over the job? The MCS themselves are fully aware of...
  16. G

    nearly lost our MCs accreditation......

    ....... because we'd not put a 'solar pv on roof' sticker on the mains incomer and our deadline to correct this was today. oops. Luckily the customer wasn't on holiday so we got it done tonight, but that gave me a minor case of squeeky bumcheeks. we did have a dual supply sticker, and the...
  17. Worcester

    New MCS Consulation > 50kW

    Just received this: I would suggest we all reply to keep it the same. In my opinion > 50kW requires different expertise and would normally be an M&E type contract, don't let these guys scope creep into commercial areas, the whole design and contract process is very different above 50kW. Same...
  18. P

    MCS assesment

    Hello All, I'm in need of some sensible help / guidance. I've just been moved into a new section in work, in at the deep end, next week we have our MCS assessment. All the original details and paperwork are not available for use, the guy who is to become the duty holder is an electrician but has...
  19. jason121

    RHI MCS Metering Guidance

    Hi Folks If the heat pump is going to have payments related to the EPC would I still need to install the valves for a heat meter thanks
  20. Worcester

    The Future of MCS...

    Spent the other day with one of our Heat Pump suppliers, their technical guy sits on the MCS steering group for Heatpumps. The following points came out: 1) MCS is distancing from Decc and becoming a charitable organisation. 2) MCS is pushing that only MCS certified organisations will be...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top