Just a couple of questions
Would you consider changing a 32A mcb to a 32A rcbo notifiable ?
If you take the cover off the CU and alter it (ie as above) do you then become responsible for the full board and have to test the lot ?
I have done some work in an integral garage, I added 3 downlights and a low level socket. The intentions are to make the back wall of the garage a utility room, with a sink, washer and dryer.. there will be a partitioned wall splitting the garage in 2.
I did this work as the garage was still a...
Hi Guys,
It has been my belief that all notifiable work, even if just a new spurred socket in a Kitchen had to have a Full Electrical Installation cert. During a telephone conversation today it was implied that something like this could still be done on a Minor Works Cert and still be...
Can some please clarify what is"notifiable" work i.e i know any work in a bathroom or outside is, but what else is? and what work can you get away with, without notifying building conrtol at all, if any?
Basicaly i am qualified just not registered with a part p Certification Scheme and have a...
Whilst waiting for assesment can you just take on all the jobs that come in and select one major and one minor for inspection or do you do just the 2 jobs and await assesment.
Chicken egg syndrome
Hi all would like to know im in process of training to hopefully be registered in the near future have a friend who has asked can i replace his shower as the current one has gone wrong.I know im not registered yet and this comes under a special location so im not sure where i stand.It has...
hello it is my first post on the forum for electricians.
If a person whith no qualifications would like to change old consumer unit for new one he should notify to Bilding Control. Please , could you tell me how it look in practice. I presume that some inspector will come to check the changed...
Hello All,
I was listening recently to the MK 17th edition podcast as I've got my 17th ed exam coming in the next few weeks.
They started to talk about notifiable work in a kitchen. They went on to saying that if the kitchen was an open plan type (like a kitchen/dining room), then the...
a friend of mine is having a shed/workshop built at the rear of his house. he asked me today if (with it being a workshop/shed/garage) do the sockets still have to comply with the positioning requirements of part P? or can he place them where he likes?
also what reference would i be looking...
I'd be grateful for some advice on the following. I am planning to install an external socket outlet on the outside wall of the kitchen, i was going to run a fused spur from the ring main (there is an existing internal socket in just the right place), however, the building regs state that...
I need to change a mains board in order to be up to regs and to show the nic. is it just a case upgrading tails and bonding. or will smoke alarms need to be wired and bathroom lights on there own circuit. I have not yet take the 17th edition course.
many thanks
hi all wonder isomeone could clarify i have been asked if i could swap a shower and light pull cord in their bathroom (only a little job)as this is in a special location and im not replacing or adding circuit am i right in saying this is not notifiable of course will first check current install...
I have been asked to do some work for a builder who is doing a extension, its a bedroom and he wants 3 new sockets adding to the existing socket ring and a new light from the existing upstairs light circuit. Should i notify building control cos its not a new circuit and not in a special location
Hi all,
Im gonna install a new circuit in my own garage & use it to show as one of my jobs for the NICEIC, so it needs to be spot on.
I have a spare way on the cb on the RCD side so ill use this.
Now is it best to install a radial or ring final? All im putting in there is about 4 2 gang...
Hi All,
I'm still working towards my C&G 2330 got my final level 3 and C&G 2382 exams in June.
Once qualified I'm looking at joining Elecsa.
However, I'm still not completely confident with regards to what is notifiable and what isn't.
For example, if you extend an existing circuit (not in a...
Hi All,
I'm not a member of niceic or suchlike (still doing last year of C&G 2330) and I'm doing the odd little job where notification to building control is not necessary.
However, I've been asked to put in some undercupboard lighting in a kitchen.
Essentially, I'm trying to establish if...
Okay. Deep breath.
Qualified electrician (C&G2381,2391), not a member of any competent person schemes because I only do one or two jobs per year (my day job isn't as an electrician)
I would like to use the local building control route for Part P work. As I am doing the work, only I can...
hello people
happy new year and all that
does anybody know if the taxman is likely to have a look at the amount of jobs you have notified to building control through napit/nic etc.
if you tell them you're a member do they have the right to check
mmm???
i wonder???
cheers
Just a quick Q. First fixing my first underfloor heating... But am only needing to wire in the supply for it. I know that it'll only be pulling 5Amps, and was just wanting to know whether it run it from its own 6Amp breaker or just FCU it to the ring which I have installed, (less than 50 m run.)...