I don't want to fall foul of Part P, so.........
I have an existing Off Peak system, whole house switches over at 00:30/01:30, BST dependent.
I want to add a storage heater to the EXISTING setup, independently wired from the CU. Since it will be an addition to an existing circuit, am I as a...