Carrying out periodics on various council properties would i be right in putting down limitations for-
Selection of conductors for current carrying capacity and voltage drop if there is no design information.
Erection methods if not present during the instillation.
Routing of cables same as...
Hi
Have big local authority carpark job to price. Cant decide if i should spend £200+ to get schedule of rates book off internet for tube, trunking, singles etc prices. Or should i work out price by labour & materials plus£, ?? Anyone had good/bad experience using schedule of rates?? Or...
I know it is possible to buy circuit schedules to stick on or near the CU unit, but do you have to use a dedicated schedule, or would a copy of your test results placed in a plastic wallet do the same job.:confused:
Hey guys,
Just a quick one.....
on the schedule of test results, which RCD reading is recorded; the highest 1x or the highest 5x? :rolleyes:
Thanks in advance.
Matt
mattcos1972
Thread
electricians' talk
highest
rcd
reading
record
results
schedule
test
anyone noticed how the model forms in guidance note 3 only have 2 sections for insulation resistance
Live/Live
Live/Earth
as opposed to:
Line/Neutral
Line/Earth
Earth/Neutral
which IS included on the minor electrical installation works certificate
Guys is there a site or place that goes into detail on the check list sheet. Some items im not quite sure what they are looking for. So was wondering is there somthing i could read that would make it a little more clear?
Many Thanks
Tim
On page 3 of schedule of inspections (where you put a tick, X or N/A in the boxes), presence of supplementary bonding conductors appears twice - once in fault protection 1) automatic disconnection of supply and again near the bottom of the page under Additional protection. Have looked in the...
pushrod
Thread
between
bonding
disconnection
electricians' talk
inspection
protection
schedule
supplementary
hi, ive just done the practical part of my 303 exam and the visual inspection on a rig so ive just got to complete the schedule of inspections for the faults i found. does anybody know what box i would have to cross on the schedule of inspections if the banjo on the swa wasnt drilled through and...
dawze
Thread
course
electricians' talk
exam
help
inspection
inspections
practical
schedule
training
I am interested to know how members are getting on using electronic means to record their test results on site. How many people are using laptops, netbooks or PDAs. Personally I am unable to get on with a PDA but am thinking of using a Samsung netbook which is 10" screen and 8 hr battery life...
sparky200
Thread
electricians' talk
electronic
pir
results
schedule
using
values
Hi could you tell me do you have to test the rcd on every cicuit am installing a new split board and was just wondering if you have to do this to every circuit. Also are these all the forms I have to supply once completed
Schedule of test results
Schedule of inspections
Electrical...
Peter Woodford
Thread
detector
electricians' talk
every
forms
rcd
schedule
section
smoke
test
Got a 6 way 3 phase dis board which hasn't a circuit schedule ,anyone know off a link to download a blank schedule and I can fill in and use as a template.Got job on Friday so a quick response would be appreciated
Has anyone got a copy of the above schedule of rates. I have a copy here but there's bits and pieces missing and I am after another copy.
If anyone has an electronic copy that they could email to me or give me a link on were to look, it would be greatly appreciated.
petegibbons
Thread
aus
electricians' talk
housing
national
rates
schedule
Hello...
I have a new electrical installation in a new house across three floors.
I am just curious as to what tests would normally be undertaken on a new installation, first and foremost for safety reasons and secondly to satisfy legal requirements (if in fact there is any difference!).
Any...
jsstevenson
Thread
aus
electrical
electrician
electricians' talk
installation
new
schedule
tests
on completing the schedule of inspection checklist, what does "presence of earthing arrangements for combined protective and functional purposes." mean?
to tick or not to tick?
someone from IEE said NA my boss said tick but i would like to know what i'm ticking or not!!
hi all, blimey ive done some posting today!
right on me schedule of test results, ive got a 16a 60898 mcb going to a metal clad 20a dp isolator via 2.5 t&E, only about 1/2 a metre to the isolator. from then on its a 2 core 2.5mm swa to the garage consumer unit.
im re writting me test sheet...