Being relatively new to EICR testing, I was not totally sure how best to enter a couple things found on an old house periodic earlier this week, and would be grateful for opinions.
1. For a single 13A socket that had been connected as a spur at the fuse board (with 2.5mm2 cable) to the wrong...
I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply.
My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
Hi
Just wondering what paperwork you all issue when replacing a consumer unit, I've been issuing an EIC and a schedule of test results I normally print them of IET website but I was just looking through their amended forms and was wondering if I should also be completing a schedule of...
Hi
My exam on fault finding is near. I now have to fill in the new report (Condition Report Inspection Schedule For Domestic And Premisses With Up to 100 A Supply). The report consist of 7 sections. Section 1 is Distributors Supply intake equipment, Section 2 is presence of adequate...
Hi, I have been asked to quote on jobs based on NAT FED schedule of rates. I have managed to find prices for most items however I've been struggling on a few. so i was wondering if any of you chaps can help. Thank in advance
Hi guys, when issuing an EIC for a cu upgrade what do you guys put in the boxes in the schedule of items inspected, when for example you can't confirm " Erection Methods " Lay off the smart comments as well :-)
Hi.
Three new circuits on one of my first proper jobs.
I hold the previous electricians (2 years ago) EIC.
On my Generic Schedule of Test results, might one simply list the other circuits (The ones I am not touching or testing) in the correct order so the form is less confusing, then add...
Hi,
I understand now that they have changed PIR to Electrical installation condition report however what I want to know what other forms come with it?
Is it still the Schedule of Test results and Schedule of inspections or have they changed the name of them too?
Unfortunately haven't got the...
Hi,
I understand now that they have changed PIR to Electrical installation condition report however what I want to know what other forms come with it?
Is it still the Schedule of Test results and Schedule of inspections or have they changed the name of them too?
Unfortunately haven't got the...
Hi all, new member here, currently a 3rd year Apprentice, im doing a C&G 2391 course at the moment, and have a problem with filling out one of the boxes on the test results, have the practical in a week so trying to master all the test procedures etc:
On the generic test results it has a single...
Hi all!
Does anyone have a copy of the 'Schedule of Items Inspected' form please?
Or know where i can get one..
my scanners gone bust so cant copy one but need to fill one in for tommorow!
+thanks
Zs-
Another question. Do I have to use another set of forms for each board as if it was another installation or can i use same forms with added test schedule sheets for other boards.
Scenario: Installed a complete new lighting circuit for a customer & at the same time added to an existing lightning circuit. All the work is to be recorded on a single EIC with sched of tests and inspections etc.
When filling in the Schedule of inspections do you ONLY include the items you...
I'm doing some research on schedule of rates for electrical works as a part of my disertation and would be grateful if anyone can provide me with a copy of the 2011 PSA schedule of rates for electrical works.
On the UK power networks G83/1 notification form, in the section information to be included, where it asks for- Computer print out (where possible)or other schedule of protection settings
what do you include? is it just a link to the inverters manufacturers website or ?
and
Electricity...
Hi
Regarding the Generic schedule of test results and form filler version
there is a line on the generic form in the OSG or BS&7671 that says equipment vulnerable to a particular test eg Rcds /flourescents/alarms electronic equipment susceptible to damage from IR tests etc
and also there is a...
Hi hope someone can help...
I am fitting a new Shower to existing CU complying with all requirements... On the schedule do I only list this new install as i havent altered any of the others. For info It is 10mm cable via a 40amp MCD to the CU's RCD
cheers
Nick
Im sure this is a
regular question on here but here we go again
If the “Routing of cables in prescribed zones” requires ether a tick or a cross on the Schedule of inspections, for i.e. a CU replacement, but the
routing of the cables is a mystery to the installer, What should be
done?
This is...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc