When filling in the schedule of test results, for example on a consumer unit change, do you record any unused ways??
eg.
1 spare
2 spare
rcd module
3 kitchen sockets
4 upstairs lighting
5 shower
6 spare
rcd module
7 upstairs sockets
8 downstairs lights
9 spare
I am doing the practical part of the Part P limited scope tomorrow. I know how to do all of the tests but how you find the PFC value in kA that is entered just below the Ze value
Also the short-circuit capacity value in the 2nd column just under over current Device.
Any ideas???
jem135
Thread
electricians' talk
help
needed
result
schedule
test
urgent
I'm currently studying for my 2391 and I have come across a question in my revision that I'm not sure about... Could anybody inform me whether if you were to do a periodic inspection of a property, but as part of the work you also did some other work i.e a new circuit. Would you have to also...
Is a socket hanging out a wall, barriers and enclosures, functional testing of accesories,
or something else I thinks is the first one but a mates says no if its out the wall it cant be operated normally, just Sunday pub debate
Pict
I have answered a few posts regarding certificates etc.
So here goes, the definitive answer to the question for the benefit of those who don't fully understand.
You must and can only issue any one of the following, whichever is relevant to the work undertaken on an Electrical Installation...
SirKit Breaker
Thread
aus
certificate
electrical
electrical work
electricians' talk
installation
paperwork
schedule
those
too
is there a website where I can download the 17th edition schedule of inspection and test results and all the electrical certificates. not the nic or nap just like the ones in the back of the regs.
coatesykid
Thread
17th
17th edition
aus
edition
electricians' talk
results
schedule
test
Hi all,
I just can't get my head around what and how you write down on the 'Schedule of Test Results' for a lighting circuit that is being fed from a FCU spurred off of a 32A ring.
Do you test as normal the ring and complete readings in the relevant columns, ie from left to right: type B...
I have done a Schedule for a db
I have list maximum zs to bs7671 @ 80%
due to the ambient temperature being 40 to 55 c
been ask to list maximum zs to bs7671 only
what would you list?
Hi, just a quick one.....
When stating the size of CPC on the schedule of tests what do you write down when the earthing is through the continuity of the metal trunking. I'm just filling in a PIR report and I want it to be right.
Cheers :-)
hi i'm taking my am2 soon and was wondering on the schedule of inspection does cat 5 cable have could under selv and what is electrical seperation : Provided for one item of current using equipment?
tomoclarke
Thread
anyone
electrical
electricians' talk
help
inspection
inspections
insulation
schedule
Having recently installed a submain, sheath to TN-C-S earth at supply end, isolated and TT'd at the far end I'm a bit unsure on the cert.
I have ticked both earthing types but am stuck on how to separate the values for each installation to put them on the same cert. Max Ze for example, should...
Originally Posted by ukpablo
"Double Insulation – Anything double insulated, i.e light fittings etc. These may also have metallic parts which must not be connected to earth. used to prevent the appearance of a dangerous voltage on the accessible parts of electrical equipment through a fault in...
after changing a board and doing a eic, do you put in the note that its just a change of board. what i mean by this is i wont of check things like conductor id,will be upgrading tails/bonds,
i will do a i.r befor to check that no probs!
cheers guys!!
cagedanimal2010
Thread
board
change
conductor
electricians' talk
found
quote
schedule
hi guys im on a rollout doing periodics at the minute, i dont have a problem testing at all my only problem is with the schedules. basically what needs to be ticked crossed and n/a. if its any help there are no limitations omposed other than no checking of routings of cable buried or otherwise...
Can anyone give me some advice.I am about to install a secondary cu board approx 20m away from main board.the new board will only have three ways,one for a small lighting circuit,one for a small socket circuit and a circuit for a shed. i intend to supply new board with 6mm t&e from 40a breaker...
I've been asked to price for some pir and remedials for a local housing association in the north west and they want me to price on a schedule of rates. I'm not too familar with pricing using schedules so was looking for any guidelines or previous schedules I could use. So if anyone has any links...
dknwireboy
Thread
appreciated
electricians' talk
help
housing
rates
schedule
Has anyone got a DB schedule template on excel, I've been told that i need to place one in the DB cover of every job that i do from now on along with a copy of of the test certs.
Thanks Paul
Hi all,
Does any ne have a copy of the current schedule of rates?
My problems is we generally and have for years worked on day to day reactive maintenance contracts at our set prices,
Now i have been given a small tender for the upgrade/rewire of 50 houses, which we really need to win...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc